MARLBOROUGH LINES LIMITED - LINES BUSINESS

PERFORMANCE MEASURES Prepared in Accordance with The Electricity (Information Disclosure) Regulations 1999 and Amendment Regulations 2000 and 2001

2003 2002 2001 2000

REGULATION 15 FINANCIAL AND EFFICIENCY PERFORMANCE MEASURES

1. Financial Performance Measures

(a) Return on Funds | 2.11% | -2.94% | 2.12% | 2.28% |
(b) Return on Equity | 0.80% | -2.19% | 0.91% | 0.90% |
(c) Return on Investment | 16.04% | -4.54% | 1.75% | 0.69% |
Return on Investment - excluding revaluations | 1.30% | | | |

2. Efficiency Performance Measures

(a) Direct Line Costs per Kilometre | $624 | $1,016 | $1,039 | $964 |
(b) Indirect Line Costs per Consumer | $77 | $101 | $91 | $104 |

  • including one off acquisition costs | $97 | | | |

REGULATION 21 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES

1. Energy Delivery Efficiency Performance Measures

(a) Load Factor | 73.9% | 62.3% | 62.6% | 58.2% |
(b) Loss Ratio | 5.7% | 5.7% | 5.9% | 6.8% |
(c) Capacity Utilisation | 27.8% | 25.0% | 26.5% | 26.0% |

2. Statistics

(a) System Length Break Down in Kilometres
kms
66kV 55
33kV 707
22kV 189
11kV 4,262
6.6kV 95
LV 1,074
Total - time weighted average basis 6,382
actual total 31 March 2003 7,493
(b) Circuit length of overhead system in kilometres
kms
66kV 55
33kV 703
22kV 189
11kV 4,183
6.6kV 94
LV 902
Total - time weighted average basis 6,125
actual total 31 March 2003 7,218
(c) Circuit Length of Underground System in Kilometres
kms
33kV 4
11kV 79
6.6kV 1
LV 172
Total - time weighted average basis 257
actual total 31 March 2003 274


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 135


Gazette.govt.nz PDF NZ Gazette 2003, No 135





✨ LLM interpretation of page content

πŸ—οΈ Marlborough Lines Limited Financial Performance Measures (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Financial Performance, ROF, ROE, ROI, Operating Surplus, Net Surplus, Amortisation, Depreciation, Revaluations, Income Tax, Energy Delivery Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Overhead System, Underground System