| Lines | Cable | Total | |
|---|---|---|---|
| Nominal Voltage | Faults per 100 km | Faults per 100 km | Faults per 100 km |
| 33 kV | 0.35 | 0.00 | 0.34 |
| 11 kV | 3.34 | 0.00 | 3.23 |
| TOTALS | 3.06 | 0.00 | 2.97 |
| | Faults/100km | Faults/100km 33kV | Faults/100km 11kV |
| Target 31/03/2004 | 2.28 | 0.70 | 2.39 |
| 31/03/2004 Avg forecast | 2.42 | 1.03 | 2.51 |
| 31/03/2005 Avg forecast | 2.15 | 0.70 | 2.25 |
| 31/03/2006 Avg forecast | 2.21 | 0.70 | 2.33 |
| 31/03/2007 Avg forecast | 2.02 | 0.70 | 2.11 |
| 31/03/2008 Avg forecast | 2.07 | 0.70 | 2.19 |
A8. The SAIDI, SAIFI, CAIDI for the total number of interruptions.
SAIDI targets for the following financial year for-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
Average SAIDI targets for the following financial year and the subsequent 4 financial years for each of-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
The SAIDI for the total number of interruptions within each interruption class.
| NETWORK OR GENERATION OWNER | Disc | CLASSIFICATION REG Class | OF INTERRUPTIONS | SAIDI | SAIFI | CAIDI |
| | | | Numerator (Cust·min) | Result (min/Conn Cust) | Numerator (Cust·int) | Result (Int/Conn Cust) | Result (min/Cust int) |
| MainPower | B | Planned Shut-downs | 1594843 | 60.83 | 6745 | 0.26 | 236.45 |
| | C+G | Unplanned Interruptions | 2041793 | 77.87 | 38204 | 1.46 | 53.44 |
| | | Subtotal | 3636636 | 138.70 | 44949 | 1.72 | 80.91 |
| Trans Power | A | Planned Shut-downs | 1950255 | 74.38 | 5037 | 0.19 | 387.19 |
| | D | Unplanned Interruptions | 1868576 | 71.27 | 20754 | 0.79 | 90.03 |
| | | Subtotal | 3818831 | 145.65 | 25791 | 0.98 | 148.07 |
| Other | G | Other Interruptions | 0 | 0.00 | 0 | 0.00 | 0.00 |
| Other | E | Unplanned Interruptions | 0 | 0.00 | 0 | 0.00 | 0.00 |
| | | Subtotal | 0 | 0.00 | 0 | 0.00 | 0.00 |
| TOTAL | | | 7455467 | 284.35 | 70740 | 2.70 | 105.39 |
Common Denominator = No of Cust. 26219.5
| Class B | SAIDI | SAIFI | CAIDI |
|---|---|---|---|
| Target 31/03/2004 | 61 | 0.41 | 254 |
| 31/03/2004 Avg forecast | 81 | 0.32 | 252 |
| 31/03/2005 Avg forecast | 94 | 0.33 | 285 |
| 31/03/2006 Avg forecast | 74 | 0.28 | 264 |
| 31/03/2007 Avg forecast | 67 | 0.28 | 240 |
| 31/03/2008 Avg forecast | 64 | 0.27 | 237 |
| Class C | SAIDI | SAIFI | CAIDI |
|---|---|---|---|
| Target 31/03/2004 | 47 | 0.99 | 48 |
| 31/03/2004 Avg forecast | 40 | 0.63 | 64 |
| 31/03/2005 Avg forecast | 35 | 0.55 | 64 |
| 31/03/2006 Avg forecast | 33 | 0.53 | 62 |
| 31/03/2007 Avg forecast | 31 | 0.50 | 62 |
| 31/03/2008 Avg forecast | 33 | 0.52 | 64 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 120
Gazette.govt.nz —
NZ Gazette 2003, No 120
✨ LLM interpretation of page content
🌾
MainPower New Zealand Ltd Energy Efficiency Performance Measures and Statistics
(continued from previous page)
🌾 Primary Industries & ResourcesEnergy, Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Overhead Lines, Underground Lines, Transformer Capacity, Maximum Demand, Electricity Supply, Customers, Faults, SAIDI, SAIFI, CAIDI, Interruptions, Planned Shut-downs, Unplanned Interruptions