β¨ Energy Disclosure Performance Measures
MAINPOWER NEW ZEALAND LTD
A. DISCLOSURE RELIABILITY PERFORMANCE MEASURES TO BE DISCLOSED BY LINE OWNERS (OTHER THAN TRANS POWER) PURSUANT TO REGULATION 22 AND PART V OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1999
(AS AMENDED)
For The Year Ended 31 March 2003
A1.
Total number of interruptions, together with a breakdown of that total according to interruption class.
| NETWORK OR GENERATION OWNER | Disc Reg Class | CLASSIFICATION OF INTERRUPTIONS | |
|---|---|---|---|
| B | Planned Shut-downs | 167 | |
| MainPower | C + G | Unplanned Interruptions | 102 |
| Subtotal | 269 | ||
| Trans Power | A | Planned Shut-downs | 2 |
| D | Unplanned Interruptions | 3 | |
| Subtotal | 5 | ||
| Other | G | Other Interruptions | |
| Other | E | Unplanned Interruptions | |
| Subtotal | |||
| TOTAL | 274 |
A2.
Interruption targets for the following financial year for-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
A3.
Average interruption targets for the following financial year and the subsequent 4 financial years for each of-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
| Class B Interruptions | Class C Interruptions | |
|---|---|---|
| Target 31/03/2004 | 150 | 90 |
| 31/03/2004 Avg forecast | 140 | 85 |
| 31/03/2005 Avg forecast | 120 | 80 |
| 31/03/2006 Avg forecast | 130 | 82 |
| 31/03/2007 Avg forecast | 130 | 75 |
| 31/03/2008 Avg forecast | 125 | 77 |
A4.
The proportion (expressed as a percentage) of the total number of Class C interruptions not restored within-
(a) 3 hours; and
(b) 24 hours.
| Not restored within 3 hours- % of Class C | Not restored within 24 hours- % of Class C |
|---|---|
| 4.6% | 0% |
A5.
With respect to faults per 100 circuit kilometers of prescribed voltage electric line, the following information:
(a) The total number of faults; and
(b) The total number of faults targeted for the following financial year; and
(c) The average total number of faults for that financial year and the subsequent 4 financial years; and
(d) A breakdown of the fault information in accordance with paragraphs (a) to (c) by different nominal line voltages.
A6.
The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
A7.
The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 120
Gazette.govt.nz —
NZ Gazette 2003, No 120
β¨ LLM interpretation of page content
πΎ