✨ Energy Reliability Statistics




23 AUGUST

NEW ZEALAND GAZETTE

8, 11,
12, 15,
16, 19 SAIDI, SAIFI and CAIDI by interruption class and in total for 1999:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions SAIDI (minutes per connected customer) SAIFI (interruptions per connected customer) CAIDI (minutes per customer interrupted)
Orion B Planned Shutdowns 17 0.09 186
C Unplanned Cuts 50 0.75 67
67 0.84 81
Transpower A Planned Shutdowns 1 0.00 475
D Unplanned Cuts 1 0.09 14
2 0.09 19
69 0.93 75

Disclosure Regulation classes E, F and G do not apply to Orion and consequently the results are all zero.

Note that these are Orion's overall reliability performance indices. Refer to Orion's Annual Report for the results by urban and rural areas.

9, 13
& 17 SAIDI, SAIFI and CAIDI targets for the next financial year:

Network Owner Disclosure Regulation Class Classification of Interruptions SAIDI Target 2003 SAIFI Target 2003 CAIDI Target 2003
Orion B Planned Shutdowns 7.0 0.07 100
C Unplanned Cuts 49.0 0.73 67

10, 14
& 18 SAIDI, SAIFI and CAIDI targets for the next five financial years:

Network or Generation Owner Disclosure Regulation Class Classification of Interruptions SAIDI Average Target 2003 - 2007 SAIFI Average Target 2003 - 2007 CAIDI Average Target 2003 - 2007
Orion B Planned Shutdowns 7.0 0.07 100
C Unplanned Cuts 49.0 0.73 67

LexisNexis



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2002, No 115


Gazette.govt.nz PDF NZ Gazette 2002, No 115





✨ LLM interpretation of page content

🌾 SAIDI, SAIFI, and CAIDI Statistics for 1999 (continued from previous page)

🌾 Primary Industries & Resources
Energy, Efficiency, Faults, Statistics, Orion, Transpower, 1999

🌾 SAIDI, SAIFI, and CAIDI Targets for 2003

🌾 Primary Industries & Resources
Energy, Efficiency, Targets, Statistics, Orion, 2003

🌾 SAIDI, SAIFI, and CAIDI Targets for 2003-2007

🌾 Primary Industries & Resources
Energy, Efficiency, Targets, Statistics, Orion, 2003-2007