β¨ Energy Efficiency Statistics
NEW ZEALAND GAZETTE
No. 115
8, 11,
12, 15,
16, 19 SAIDI, SAIFI and CAIDI by interruption class and in total for 2001:
| Network or Generation Owner | Disclosure Regulation Class | Classification of Interruptions | SAIDI (minutes per connected consumer) | SAIFI (interruptions per connected consumer) | CAIDI (minutes per consumer interrupted) |
|---|---|---|---|---|---|
| Orion | B | Planned Shutdowns | 3 | 0.02 | 165 |
| C | Unplanned Cuts | 59 | 0.58 | 102 | |
| 62 | 0.60 | 104 | |||
| Transpower | A | Planned Shutdowns | 0 | 0.00 | 0 |
| D | Unplanned Cuts | 0 | 0.00 | 10 | |
| 0 | 0.00 | 10 |
8, 11,
12, 15,
16, 19 SAIDI, SAIFI and CAIDI by interruption class and in total for 2000:
| Network or Generation Owner | Disclosure Regulation Class | Classification of Interruptions | SAIDI (minutes per connected consumer) | SAIFI (interruptions per connected consumer) | CAIDI (minutes per consumer interrupted) |
|---|---|---|---|---|---|
| Orion | B | Planned Shutdowns | 6 | 0.03 | 233 |
| C | Unplanned Cuts | 46 | 0.80 | 56 | |
| 52 | 0.83 | 62 | |||
| Transpower | A | Planned Shutdowns | 0 | 0.00 | 195 |
| D | Unplanned Cuts | 0 | 0.02 | 1 | |
| 0 | 0.02 | 25 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2002, No 115
Gazette.govt.nz —
NZ Gazette 2002, No 115
β¨ LLM interpretation of page content
πΎ
Energy Delivery Efficiency Performance Measures and Statistics
(continued from previous page)
πΎ Primary Industries & ResourcesEnergy, Efficiency, Faults, Underground Lines, Overhead Lines, Statistics
πΎ SAIDI, SAIFI, and CAIDI Statistics for 2001
πΎ Primary Industries & ResourcesEnergy, Efficiency, Faults, Statistics, Orion, Transpower, 2001
πΎ SAIDI, SAIFI, and CAIDI Statistics for 2000
πΎ Primary Industries & ResourcesEnergy, Efficiency, Faults, Statistics, Orion, Transpower, 2000