Energy Reliability Performance




28 MAY NEW ZEALAND GAZETTE 1219

3.3 RELIABILITY PERFORMANCE MEASURES (con’t)

b) The measure of unplanned interruptions directly resulting from unplanned interruptions of a transmission system calculated by the formula a/b where:

a = the sum obtained by adding together the number of customer-hours lost during each interruption; and

b = the total number of customers being supplied by means of the system.

System Unplanned interruption measure (resulting from transmission interruptions) Apr00-Dec00
Alfriston
Ashhurst
Auckland Central
Bruce McLaren
Dannevirke
Drury
Feilding
Foxton
Hastings
Hastings
Hunua
Kakarki
Kairanga
Kingseat
Levin
Longburn
Mangaroa
Mangatainoka
Oroua Downs
Pahiatua
Palmerston North
Pukekohe
Ramarama
Takapau
Tuakau
Waimauku
Waikuku
Wellington

PUBLISHED BY THE
DEPARTMENT OF INTERNAL AFFAIRS
PRINTED BY WICKLIFFE LIMITED

ISSN 0111-5650
Price $5.00 (inc. G.S.T.)




Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 53


Gazette.govt.nz PDF NZ Gazette 2001, No 53





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery, Efficiency Performance, Gas Systems, Total Customers, Unplanned Interruptions