✨ Energy Reliability Performance
28 MAY NEW ZEALAND GAZETTE 1219
3.3 RELIABILITY PERFORMANCE MEASURES (con’t)
b) The measure of unplanned interruptions directly resulting from unplanned interruptions of a transmission system calculated by the formula a/b where:
a = the sum obtained by adding together the number of customer-hours lost during each interruption; and
b = the total number of customers being supplied by means of the system.
| System | Unplanned interruption measure (resulting from transmission interruptions) Apr00-Dec00 |
|---|---|
| Alfriston | |
| Ashhurst | |
| Auckland Central | |
| Bruce McLaren | |
| Dannevirke | |
| Drury | |
| Feilding | |
| Foxton | |
| Hastings | |
| Hastings | |
| Hunua | |
| Kakarki | |
| Kairanga | |
| Kingseat | |
| Levin | |
| Longburn | |
| Mangaroa | |
| Mangatainoka | |
| Oroua Downs | |
| Pahiatua | |
| Palmerston North | |
| Pukekohe | |
| Ramarama | |
| Takapau | |
| Tuakau | |
| Waimauku | |
| Waikuku | |
| Wellington |
PUBLISHED BY THE
DEPARTMENT OF INTERNAL AFFAIRS
PRINTED BY WICKLIFFE LIMITED
ISSN 0111-5650
Price $5.00 (inc. G.S.T.)
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2001, No 53
Gazette.govt.nz —
NZ Gazette 2001, No 53
✨ LLM interpretation of page content
🏭
Energy Delivery Efficiency Performance Measures and Statistics
(continued from previous page)
🏭 Trade, Customs & IndustryEnergy Delivery, Efficiency Performance, Gas Systems, Total Customers, Unplanned Interruptions