3.3 RELIABILITY PERFORMANCE MEASURES

For the 9 months ended 31 December 2000

Schedule 1 – PART 4

Unplanned Interruptions in Distribution Systems

a) The measure of unplanned interruptions (other than those directly resulting from unplanned interruptions of a transmission system) calculated by the formula a/b where;

a = the sum obtained by adding together the number of customer-hours lost during each interruption; and

b = the total number of customers being supplied by means of the system.

System Unplanned interruption measure (within distribution system) Apr00-Dec00
Alfriston ^ 0.3333
Ashhurst ^ 0.0078
Auckland Central ^ 0.0013
Bruce McLaren -
Dannevirke -
Drury -
Feilding ^ 0.0009
Foxton -
Hastings ^ 0.0006
Hunua -
Kakarriki -
Kairanga -
Kingseat -
Levin ^ 0.0007
Longburn -
Mangaroa -
Mangatainoka -
Oroua Downs -
Pahiatua -
Palmerston North ^ 0.0022
Pukekohe -
Ramarama -
Takapau -
Tuakau -
Waimauku -
Waikuku ^ 0.0053
Wellington -

^6 On systems where the number of customers affected has been recorded, but the length of each interruption has not been recorded, the local engineer has estimated the average length of the interruptions. The specific system involved is recorded. This data has been shown by a ^.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2001, No 53


Gazette.govt.nz PDF NZ Gazette 2001, No 53





✨ LLM interpretation of page content

🏭 Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery, Efficiency Performance, Gas Systems, Total Customers, Unplanned Interruptions