β¨ Electrical Reliability Performance Measures
10 SEPTEMBER NEW ZEALAND GAZETTE 3179
| targets |
|---|
| 2003-06 |
- SAIDI - total customer minutes
| | 177.7 | 171.6 | 246.0 | 283.0 |
9.-11. SAIDI per interruption class
| Class - Description | customer minutes |
|---|---|
| A - Transpower Planned | |
| (a) B - ML Ltd Planned | 74.0 |
| (b) C - ML Ltd Unplanned | 123.5 |
| D - Transpower Unplanned | |
| E - ECNZ Unplanned | |
| F - Other Generation | |
| G - Other |
- SAIFI - total interruptions ^6
| | 2.2 | 2.2 | 1.5 | 2.3 | 4.1 |
13.-15. SAIFI per interruption class ^6
| Class - Description | customer minutes |
|---|---|
| A - Transpower Planned | |
| (a) B - ML Ltd Planned | 0.4 |
| (b) C - ML Ltd Unplanned | 1.9 |
| D - Transpower Unplanned | |
| E - ECNZ Unplanned | |
| F - Other Generation | |
| G - Other |
- CAIDI - customer minutes ^6
| | 82.2 | 113.6 | 109.0 | 69.9 |
17.-19. CAIDI per interruption class ^6
| Class - Description | customer minutes |
|---|---|
| A - Transpower Planned | |
| (a) B - ML Ltd Planned | 176.4 |
| (b) C - ML Ltd Unplanned | 64.2 |
| D - Transpower Unplanned | |
| E - ECNZ Unplanned | |
| F - Other Generation | |
| G - Other |
^6 denotes data is, or is based on, an estimate - the methodology by which the estimate was calculated is publicly available
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2001, No 121
Gazette.govt.nz —
NZ Gazette 2001, No 121
β¨ LLM interpretation of page content
π
Marlborough Lines Limited Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryReliability Performance, Interruptions, Faults, Restoration Times, Electrical Infrastructure, Marlborough Lines Limited