β¨ Reliability Performance Measures
REGULATION 22 RELIABILITY PERFORMANCE MEASURES
| targets |
|---|
| 2003/06 |
1. Number of interruptions and interruption Targets by class
| Class - Description | number of interruptions |
|---|---|
| A - Transpower Planned | |
| (a) B - ML Ltd Planned | 143 |
| (b) C - ML Ltd Unplanned | 197 |
| D - Transpower Unplanned | |
| E - ECNZ Unplanned | |
| F - Other Generation | |
| G - Other | |
| Total |
4. Percentage of Class C interruptions not restored within-
(a) Three hours | 29.5% | 22.4% | 23.3%
(b) 24 hours | 1.6% | 2.4% | 1.5%
5. Faults (Class C) per 100 kilometres
| Total number of faults per 100 km |
|---|
| 33 kV |
| 11kV |
| 6.6kV |
| Total |
6. Faults (Class C) per 100 kilometres underground
33 kV |
11kV | | | | 4.3 | 3.0 | 3.1
Total | | | | 4.2 | 2.9 | 1.5
7. Faults (Class C) per 100 km overhead
33 kV | 3.9 | 0.8 | 2.7 | 2.3
11kV | 14.6 | 5.8 | 6.1 | 7.3
6.6kV | | 2.0 |
Total | 13.1 | 5.2 | 5.6 | 6.6
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2001, No 121
Gazette.govt.nz —
NZ Gazette 2001, No 121
β¨ LLM interpretation of page content
π
Marlborough Lines Limited Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryReliability Performance, Interruptions, Faults, Restoration Times, Electrical Infrastructure, Marlborough Lines Limited