β¨ Electricity Reliability Performance Measures
NEW ZEALAND GAZETTE
No. 120
A6. The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
A7. The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| Nominal Voltage | Lines Faults per 100 km | Cable Faults per 100 km | Total Faults per 100 km |
|---|---|---|---|
| 33 kV | 1.79 | 0 | 1.78 |
| 11 kV | 5.53 | 5.30 | 5.53 |
| TOTALS | 5.65 | 5.19 | 5.63 |
| Faults/100km | Faults/100km 33kV | Faults/100km 11kV | |
|---|---|---|---|
| Target 31/03/02 | 5.40 | 1.75 | 5.35 |
| 31/03/2002 Avg forecast | 5.62 | 1.77 | 5.48 |
| 31/03/2003 Avg forecast | 5.57 | 1.72 | 5.15 |
| 31/03/2004 Avg forecast | 5.37 | 1.67 | 4.82 |
| 31/03/2005 Avg forecast | 4.79 | 1.61 | 4.71 |
| 31/03/2006 Avg forecast | 4.32 | 1.57 | 4.66 |
A8. The SAIDI, SAIFI, CAIDI for the total number of interruptions.
SAIDI targets for the following financial year for-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
Average SAIDI targets for the following financial year and the subsequent 4 financial years for each of-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
The SAIDI for the total number of interruptions within each interruption class.
| NETWORK OR GENERATION OWNER | Disc Reg Class | CLASSIFICATION OF INTERRUPTIONS | SAIDI Numerator (Cust-min) | SAIDI Result (min/Conn Cust) | SAIFI Numerator (Cust-int) | SAIFI Result (Int/Conn Cust) | CAIDI Result (min/Cust int) |
|---|---|---|---|---|---|---|---|
| MainPower | B | Planned Shut-downs | 1509508 | 60.48 | 6725 | 0.27 | 224.48 |
| C + G | Unplanned Interruptions | 2283358 | 91.48 | 45148 | 1.81 | 50.61 | |
| Subtotal | 3792966 | 151.96 | 51843 | 2.08 | |||
| TransPower | A | Planned Shut-downs | 0 | 0.00 | 0 | 0.00 | 333.00 |
| D | Unplanned Interruptions | 0 | 0.00 | 0 | 0.00 | 0.00 | |
| Subtotal | 0 | 0.00 | 0 | 0.00 | |||
| Other | G | Other Interruptions | 0 | 0.00 | 0 | 0.00 | |
| Other | E | Unplanned Interruptions | 0 | 0.00 | 0 | 0.00 | 0.00 |
| Subtotal | 0 | 0.00 | 0 | 0.00 | |||
| TOTAL | 3792966 | 151.96 | 51843 | 2.08 | 73.16 |
Common Denominator = No of Cust. 24960.5
| Class B | SAIDI | SAIFI | CAIDI |
|---|---|---|---|
| Target 31/03/02 | 42 | 0.19 | 221 |
| 31/03/2002 Avg forecast | 45 | 0.21 | 214 |
| 31/03/2003 Avg forecast | 43 | 0.20 | 215 |
| 31/03/2004 Avg forecast | 36 | 0.15 | 240 |
| 31/03/2005 Avg forecast | 25 | 0.13 | 192 |
| 31/03/2006 Avg forecast | 23 | 0.12 | 192 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2001, No 120
Gazette.govt.nz —
NZ Gazette 2001, No 120
β¨ LLM interpretation of page content
πΎ
Disclosure of Reliability Performance Measures by Line Owners
(continued from previous page)
πΎ Primary Industries & ResourcesElectricity, Reliability Performance, Interruptions, Faults, MainPower New Zealand Ltd, Trans Power, Line Owners