β¨ Financial and Efficiency Performance Measures
3008 NEW ZEALAND GAZETTE No. 118
Regulation 22:
-
(1) (a) Reliability performance measures
2000 1999 1998 1997 1996Class A 0 0 0 0 0
Class B 309 271 343 511 350
Class C 357 273 257 385 369
Class D 7 6 4 10 12
Total 673 550 604 906 731(b) Planned Interruptions
2001 2002 2003 2004 2005 Average 2001/05Class A 0 0 0 0 0 0
Class B 450 450 450 450 450 450
Class C 427 384 346 311 280 350
Class D 0 0 0 0 0 0(c) Class C Interruptions for 1999
Number % of OutagesNot restored in 3 hours 99 27.73%
Not restored in 24 hours 0 0.00%(2)(a) Total number of faults per 100 circuit kilometres prescribed voltage electric lines.
2000 1999 1998 1997 8.2 9.6 10.0 14.7(b) Planned Faults per 100 circuit kilometres prescribed voltage electric lines.
2001 2002 2003 2004 2005 Average 2001/0533kV 9.0 10.0 9.0 8.6 8.1 9
11kV 8.5 7.7 6.9 6.5 6.2 7
Total 8.6 7.7 7.0 6.6 6.3 7(3)(a) Total number of faults per 100 circuit kilometres of underground
prescribed voltage electric lines.2000 1999 1998 199733kV 0 0 0 0
11kV 8.3 16.7 0 16.7
Total 8.3 16.7 0 16.7(b) Planned number of faults per 100 circuit kilometres of underground
prescribed voltage electric lines.2001 2002 2003 2004 2005 Average 2001/0533kV 0 0 0 0 0 0
11kV 5.0 5.0 5.0 5.0 5.0 5.0
Total 5.0 5.0 5.0 5.0 5.0 5.0(4)(a) Total number of faults per 100 circuit kilometres of overhead prescribed voltage
electric lines.2000 1999 1998 199733kV 8.7 11.1 15.7 13.2
11kV 8.2 9.4 9.5 14.7
Total 8.2 9.6 10.0 14.7
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2000, No 118
Gazette.govt.nz —
NZ Gazette 2000, No 118
β¨ LLM interpretation of page content
π
Financial and Efficiency Performance Measures for The Lines Company Limited
(continued from previous page)
π Trade, Customs & IndustryFinancial Performance, Efficiency Measures, Electricity, The Lines Company Limited, Regulations 22