Centralines Limited – Line Business

9. SAIDI Targets for 2000/01

2000/01
Planned Interruptions 95
Unplanned Interruptions 130
Total Interruptions 225

10. SAIDI Future Targets (Average for the next 5 years)

2000/2005
Planned Interruptions 78
Unplanned Interruptions 106
Total Interruptions 184

11. SAIDI per Interruption Class

Interruption Class 1999/00 1998/9 1997/8 1996/7
Planned Transpower 420 240 0 240
Planned Centralines 163 65 16 36
Unplanned Centralines 163 188 85 124
Unplanned Transpower 0 0 75 0
Unplanned Centralines Generation 0 0 0 0
Unplanned Other Generators 0 0 0 0
Unplanned Other Line Owner 0 0 0 0
Planned Other Line Owner 0 NA NA NA
Other Interruptions 0 NA NA NA

12. System Average Interruption Frequency Index (SAIFI)

1999/00 1998/9 1997/8 1996/7
Total Interruptions 6.94 3.73 1.91 2.53


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2000, No 103


Gazette.govt.nz PDF NZ Gazette 2000, No 103





✨ LLM interpretation of page content

πŸ’° Centralines Limited – Line Business Reliability Performance Measures (continued from previous page)

πŸ’° Finance & Revenue
Electricity, Performance Measures, Statistics, Centralines Limited, Reliability, Interruptions