Electricity Reliability Performance Measures




2296
NEW ZEALAND GAZETTE
No. 95

  1. Consumer Average Interruption Duration Index (CAIDI)

Total Interruptions

1998/99 1997/8 1996/7 1995/6
132 71.6 158 140
  1. CAIDI Targets for 1999/2000

Planned Interruptions 115
Unplanned Interruptions 86
Total Interruptions 92

  1. CAIDI Future Targets (Average for the next 5 years)

Planned Interruptions 102
Unplanned Interruptions 88
Total Interruptions 91

  1. CAIDI per Interruption Class
Interruption Class 1998/9 1997/8 1996/7 1995/6
Planned Transpower 240 0 240 240
Planned CHB Power 116 144 208 121
Unplanned CHB Power 86 106 91 93
Unplanned Transpower 0 75 0 0
Unplanned CHB Power Generation 0 0 0 0
Unplanned Other Generators 0 0 0 0
Planned Other Line Owner 0 NA NA NA
Other Interruptions 0 NA NA NA

PUBLISHED BY AUTHORITY OF DEPARTMENT OF INTERNAL AFFAIRS:
LEGISLATION DIRECT, WELLINGTON, NEW ZEALAND—1998
ISSN 0111-5650
Price $3.95 (inc. G.S.T.)
32214—99A


PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 95


NZLII PDF NZ Gazette 1999, No 95





✨ LLM interpretation of page content

🏗️ Reliability Performance Measures (continued from previous page)

🏗️ Infrastructure & Public Works
31 March 1999
Electricity, Reliability, Performance Measures, CAIDI, Interruption Duration, CAIDI Targets, Planned Interruptions, Unplanned Interruptions