✨ Electricity Reliability Statistics




2294 NEW ZEALAND GAZETTE No. 95

  1. System Average Interruption Duration Index (SAIDI)
1998/99 1997/8 1996/7 1995/6
Total Interruptions 493 176 400 524
  1. SAIDI Targets for 1999/2000
1999/2000
Planned Interruptions
Unplanned Interruptions
Total Interruptions
  1. SAIDI Future Targets (Average for the next 5 years)
1999/2004
Planned Interruptions
Unplanned Interruptions
Total Interruptions
  1. SAIDI per Interruption Class
1998/9 1997/8 1996/7 1995/6
Planned Transpower 240 0 240 240
Planned CHB Power 65 16 36 114
Unplanned CHB Power 188 85 124 170
Unplanned Transpower 0 75 0 0
Unplanned CHB Power Generation 0 0 0 0
Unplanned Other Generators 0 0 0 0
Unplanned Other Line Owner 0 0 0 0
Planned Other Line Owner 0 NA NA NA
Other Interruptions 0 NA NA NA


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 95


NZLII PDF NZ Gazette 1999, No 95





✨ LLM interpretation of page content

πŸ—οΈ Reliability Performance Measures (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
31 March 1999
Electricity, Reliability, Performance Measures, Faults, Line Interruptions, SAIDI, Interruption Duration