β¨ Buller Electricity Reliability Statistics
3938
NEW ZEALAND GAZETTE
No. 164
BULLER ELECTRICITY LIMITED β LINE BUSINESS
- The SAIDI for the total number of interruptions within each interruption class
Class A - Planned by Transpower
0
0
0
0
Class B - Planned by Line Owner
147.88
123.16
210.19
397.08
Class C - Unplanned by Line Owner
233.63
201.61
265.89
211.0
Class D - Unplanned by Transpower
45.03
121.00
41.83
Class E - Unplanned by ECNZ
0
0
0
0
Class F - Unplanned by other generator
0
0
0
0
Class G - Any Other Loss of Supply
0
0
0.02
0
-
The SAIFI for the total number of Interruptions
3.30
4.90
7.41
3.81 -
SAIFI Targets for 1999/2000
Class B - Planned by Line Owner
0.86
Class C - Unplanned by Line Owner
2.30
- Average SAIFI targets for 1999/2000 and the subsequent four financial years
Class B - Planned by Line Owner
0.83
0.83
0.80
0.78
0.78
Class C - Unplanned by Line Owner
2.30
2.30
2.30
2.30
- The SAIFI for the total number of Interruptions within each Interruption Class
Class A - Planned by Transpower
0
0
0
0
Class B - Planned by Line Owner
0.91
0.79
0.82
1.66
Class C - Unplanned by Line Owner
2.39
3.11
2.59
1.15
Class D - Unplanned by Transpower
0
1.00
4.00
1.00
Class E - Unplanned by ECNZ
0
0
0
0
Class F - Unplanned by other generator
0
0
0
0
Class G - Any Other Loss of Supply
0
0
0
0
-
The CAIDI for the total of all Interruptions
115.7
75.50
80.63
170.41 -
CAIDI targets for 1999/2000
Class B - Planned by Line Owner
160
Class C - Unplanned by Line Owner
97
- Average CAIDI targets for 1999/2000 and the subsequent four financial years
Class B - Planned by Line Owner
160
160
160
160
160
Class C - Unplanned by Line Owner
97
97
97
97
- The CAIDI for the total number of Interruptions within each Interruption Class
Class A - Planned by Transpower
0
0
0
0
Class B - Planned by Line Owner
163.14
156.41
256.79
239.04
Class C - Unplanned by Line Owner
97.68
64.83
102.83
183.05
Class D - Unplanned by Transpower
0
45.0
30.25
41.83
Class E - Unplanned by ECNZ
0
0
0
0
Class F - Unplanned by other generator
0
0
0
0
Class G - Any Other Loss of Supply
0
0
10.0
0.0
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 164
NZLII —
NZ Gazette 1999, No 164
β¨ LLM interpretation of page content
π
Buller Electricity Limited Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryReliability Performance, Interruptions, Faults, SAIDI, SAIFI, CAIDI, Buller Electricity Limited