β¨ Buller Electricity Limited Reliability Performance Measures
NEW ZEALAND GAZETTE
5 NOVEMBER
BULLER ELECTRICITY LIMITED β LINE BUSINESS
2000 | 1999 | 1998 | 1997 | 1996
5. Reliability Performance Measures
-
Total Number of Interruptions
- Class A - Planned by Transpower: 0 | 0 | 0 | 0
- Class B - Planned by Line Owner: 51 | 36 | 34 | 38
- Class C - Unplanned by Line Owner: 56 | 97 | 64 | 144
- Class D - Unplanned by Transpower: 0 | 1 | 4 | 2
- Class E - Unplanned by ECNZ: 0 | 0 | 0 | 0
- Class F - Unplanned by other generator: 0 | 0 | 0 | 0
- Class G - Any Other Loss of Supply: 0 | 0 | 1 | 0
- Total: 107 | 134 | 103 | 184
-
Interruption Targets for 1999/2000
- Class B - Planned by Line Owner: 45
- Class C - Unplanned by Line Owner: 65
-
Average Interruption Targets for the 1999/2000 and subsequent four financial years
- Class B - Planned by Line Owner: 45 | 45 | 41 | 37 | 37
- Class C - Unplanned by Line Owner: 65 | 65 | 65 | 65 | 65
-
The Proportion of Class C Interruptions not restored within
- 3 Hours: 25%
- 24 Hours: 0%
-
The total number of faults per 100 circuit kilometres of prescribed voltage electric line
- [a] 11kV
- 2000: 24.32
- 1999: 29.95
- 1998: 22.18
- 1997: 32.38
- [b] The total number of faults targeted for 1999/2000: 65
- [c] The average total number of faults for 1999/2000 and subsequent four financial years: 65 | 65 | 65 | 65 | 65
- [a] 11kV
-
The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line
- 0 | 0 | 0 | 0
-
The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line
- 33kV: 4.5 | 30.13 | 22.27 | 33.09
- 11kV: 15.55 | 2.70 | 8.08 | 0.00
-
The SAIDI for the total number of interruptions
- 2000: 381.50
- 1999: 369.80
- 1998: 597.10
- 1997: 649.91
-
SAIDI targets for 1999/2000
- Class B - Planned by Line Owner: 130
- Class C - Unplanned by Line Owner: 250
-
Average SAIDI targets for 1999/2000 and the subsequent four financial years
- Class B - Planned by Line Owner: 125 | 125 | 120 | 115 | 115
- Class C - Unplanned by Line Owner: 250 | 250 | 250 | 250 | 250
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 164
NZLII —
NZ Gazette 1999, No 164
β¨ LLM interpretation of page content
π
Buller Electricity Limited Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryReliability Performance, Interruptions, Faults, SAIDI, Buller Electricity Limited