✨ Performance Measures for Line Owners




Schedule 1 Part 5 Reliability Performance Measures to be Disclosed by Line Owners Other Than Transpower

Target 2000 to 2004 Target 2000 Actual 1999 Actual 1998 Actual 1997 Actual 1996
10,11 SAIFI
Class A Planned outages TransPower - - - -
Class B Planned outages WEL 0.05 0.05 0.05 0.06 0.04 0.10
Class C Unplanned outages WEL 1.55 1.75 1.84 2.12 3.15 2.40
Class D Unplanned outages TransPower 0.59 0.14 - 0.50
Class E Unplanned Interruption ECNZ - - - -
Class F Unplanned Interruption other generator - - - -
Class G Other Interruption - - - -
TOTAL 2.48 2.32 3.19 3.00

12,13 CAIDI

Target 2000 to 2004 Target 2000 Actual 1999 Actual 1998 Actual 1997 Actual 1996
Class A Planned outages TransPower - - - -
Class B Planned outages WEL 83.00 90.00 94.71 79.58 84.93 182.00
Class C Unplanned outages WEL 63.00 68.00 71.97 67.73 54.83 58.00
Class D Unplanned outages TransPower 80.07 301.34 - 77.00
Class E Unplanned Interruption ECNZ - - - -
Class F Unplanned Interruption other generator - - - -
Class G Other Interruption - - - -
TOTAL 74.39 82.56 55.16 66.00

NEW ZEALAND GAZETTE
No. 134
3240



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1999, No 134


NZLII PDF NZ Gazette 1999, No 134





✨ LLM interpretation of page content

🏭 Schedule 1 Part 5 Reliability Performance Measures to be Disclosed by Line Owners Other Than Transpower (continued from previous page)

🏭 Trade, Customs & Industry
Faults per 100 km, Underground, SAIDI, Planned outages, Unplanned outages, Performance measures, Line owners, Transpower, WEL