β¨ Electricity Fault and Interruption Statistics
NEW ZEALAND GAZETTE
No. 124
Total number of faults per 100 circuit kilometres of prescribed voltage electric line together with a breakdown according to nominal line voltages
| 1999 | 1998 | 1997 | 1996 | |
|---|---|---|---|---|
| 33kV | 2.7 | 2.2 | 4.3 | 2.9 |
| 22kV | 5.8 | 3.2 | 4.8 | 3.6 |
| 11kV | 9.3 | 9.7 | 7.6 | 7.8 |
Total number of faults per 100 circuit kilometres | 8.1 | 8.2 | 6.9 | 6.8 |
Total number of faults per 100 circuit kilometres of underground prescribed voltage electric line together with a breakdown according to nominal live voltages
| 1999 | 1998 | 1997 | 1996 | |
|---|---|---|---|---|
| 33kV | 0 | 0 | 0 | 0 |
| 22kV | 0 | 0 | 0 | 0 |
| 11kV | 0 | 0 | 0 | 0 |
Total number of faults per 100 circuit kilometres | 0 | 0 | 0 | 0 |
Total number of faults per 100 circuit kilometres of overhead prescribed voltage electric lines
| 1999 | 1998 | 1997 | 1996 | |
|---|---|---|---|---|
| 33kV | 2.7 | 2.2 | 4.3 | 2.9 |
| 22kV | 5.8 | 3.2 | 4.8 | 3.6 |
| 11kV | 9.3 | 9.7 | 7.6 | 7.8 |
Total number of faults per 100 circuit kilometres of overhead prescribed voltage electric lines | 8.1 | 8.2 | 6.9 | 6.8 |
INTERRUPTION INDICES
SAIDI
| Class | Description | 1999 | 1998 | 1997 | 1996 |
|---|---|---|---|---|---|
| A | planned interruption by Transpower | 64.8 | 0 | 0 | 25.9 |
| B | being a planned interruption by the principal line owner (other than Transpower) | 119.8 | 157.4 | 82.7 | 68 |
| C | being an unplanned interruption originating within the works of the principal line owner, where those works are used for carrying out line business activities | 220.8 | 295.6 | 113.4 | 82.6 |
| D | being an unplanned interruption originating within the works of Transpower, where those works are used for carrying out line business activities | 88.1 | 0 | 0 | 23.3 |
| E | being an unplanned interruption originating within works used, by the principal line owner, for the generation of electricity | 0 | 0 | 0 | 0 |
| F | being an unplanned interruption originating within works used, by persons other than the principal line owner, for the generation of electricity | 0 | 0 | 0 | 0 |
| G | being an unplanned interruption caused by another line owner | 0 | 0 | 0 | 0 |
| H | being a planned interruption caused by another line owner | 0 | 0 | 0 | 0 |
| I | being an interruption not referred to in any of paragraphs (a) to (h) | 0 | 0 | 0 | 0 |
Total number of Interruptions | 493.4 | 453 | 196 | 200 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 124
NZLII —
NZ Gazette 1999, No 124
β¨ LLM interpretation of page content
ποΈ
Reliability Performance Measures for Electricity Interruptions
(continued from previous page)
ποΈ Infrastructure & Public WorksElectricity, Faults, Interruptions, Reliability, Performance Measures, Statistics