✨ Electricity Reliability Performance Measures
17 SEPTEMBER
NEW ZEALAND GAZETTE
Reliability Performance Measures
Total number of interruptions together with a breakdown of the total according to interruptions
TOTAL NUMBER OF INTERRUPTIONS (together with a breakdown of that total according to Interruptions Class)
| INTERRUPTION CLASS | Number of Interruptions |
|---|---|
| 1999 | |
| Class A – Planned interruption by Transpower | 1 |
| Class B – being a planned interruption by the principal line owner (other than Transpower) | 184 |
| Class C – being an unplanned interruption originating within the works of the principal line owner, where those works are used for carrying out line business activities | 291 |
| Class D – being an unplanned interruption originating within the works of Transpower, where those works are used for carrying out line business activities | 4 |
| Class E – being an unplanned interruption originating within works used, by the principal line owner, for the generation of electricity | 0 |
| Class F – being an unplanned interruption originating within works used, by persons other than the principal line owner, for the generation of electricity | 0 |
| Class G – being an unplanned interruption caused by another line owner | 0 |
| Class H – being a planned interruption caused by another line owner | 0 |
| Class I – being an interruption not referred to in any of paragraphs (a) to (h) | 0 |
| Total number of Interruptions | 480 |
INTERRUPTION TARGETS
| 2000 | 5 Year Average | |
|---|---|---|
| Class B – being a planned interruption by the principal owner (other than Transpower) | 170 | 150 |
| Class C – being an unplanned interruption originating within the works of the principal line owner where those works are used for carrying out line business activities | 270 | 250 |
Restoration Times
The proportion (expressed as a percentage) of the total number of Class C interruptions not restored within:
| Time | 1999 |
|---|---|
| 3 hours | 15.4% |
| 24 hours | 0% |
| Total number of faults per 100 circuit kilometres of prescribed voltage electric line | 1999 | 1998 | 1997 | 1996 |
|---|---|---|---|---|
| 8.1 | 8.2 | 6.9 | 6.8 |
| Total target number of faults per 100 circuit kilometres of prescribed voltage electric line: | 2000 | 5 Year Average |
|---|---|---|
| 33kV | 2.5 | 2.3 |
| 22kV | 5.3 | 4.9 |
| 11kV | 8.6 | 8.1 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1999, No 124
NZLII —
NZ Gazette 1999, No 124
✨ LLM interpretation of page content
🏗️ Reliability Performance Measures for Electricity Interruptions
🏗️ Infrastructure & Public WorksElectricity, Interruptions, Reliability, Performance Measures, Statistics