✨ Electricity Infrastructure Statistics




NEW ZEALAND GAZETTE

No. 168

(b) Circuit Length of Overhead System

1997/98 1996/97 1995/96 1994/95
33kV 357.3 km 2575.3 km 256.1 km 155.8 km
11kV 2,013.6 km 1,886.7 km 1,873.6 km 1,886.5 km
6.6kV 51.1 km 51.1 km 51.2 km 51.1 km
LV 398.7 km 219.3 km 217.1 km 215.5 km
Total 2,720.7 km 2,422.5 km 2,398.0 km 2,409.1 km

(c) Circuit length of Underground System

1997/98 1996/97 1995/96 1994/95
33kV 1.6 km 1.6 km 1.6 km 1.2 km
11kV 64.4 km 40.6 km 37.1 km 8.4 km
6.6kV - - - -
LV 73.3 km 65.4 km 57.3 km 65.2 km
Total 139.3 km 107.7 km 96.0 km 74.9 km

(d) Transformer Capacity in kVA As At 31 March

1998 1997 1996 1995
192,355 kVA 178,074 kVA 169,213 kVA 163,712 kVA

(e) Maximum Demand

1998 1997 1996 1995
54,545 kW 54,051 kW 53,071 kW 50,957 kW

(f) Total Electricity Supplied from the System

1998 1997 1996 1995
276,760,873 kWh 564,295,394 kWh 257,386,189 kWh 243,022,917 kWh

(g) Total Electricity Conveyed Through the System on behalf of another person

1998 1997 1996 1995
9,462,620 kWh 10,578,714 kWh 8,687,882 kWh Zero

(h) Total Customer Average

1998 1997 1996 1995
19,804 Customers 19,517 Customers 19,300 Customers 19,031 Customers


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 168


NZLII PDF NZ Gazette 1998, No 168





✨ LLM interpretation of page content

πŸ—οΈ Marlborough Electric Limited Performance Measures (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Electricity, Performance Measures, Financial, Efficiency, Energy Delivery, Statistics