✨ Electricity Performance Measures




5 OCTOBER NEW ZEALAND GAZETTE 4013

MARLBOROUGH ELECTRIC LIMITED

PERFORMANCE MEASURES FOR THE LINE BUSINESS

Prepared in accordance with the

ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

1. Financial Performance Measures

1997/98 1996/97 1995/96 1994/95
(a) Accounting Return on Total Assets 3.44% 5.15% 2.69% 1.36%
(b) Accounting Return on Equity 1.66% 3.16% 1.19% 0.21%
(c) Accounting Rate of Profit 8.70% 3.35% 1.68% 0.72%

2. Efficiency Performance Measures

1997/98 1996/97 1995/96 1994/95
(a) Direct Line Costs per Kilometre $954 $958 $1,246 $1,428
(b) Indirect Line Costs per Customer $83 $70 $79 $76

Energy Delivery Efficiency Performance Measures

(Electricity (Information Disclosure) Regulations 1994 First Schedule Part III 1)

1997/98 1996/97 1995/96 1994/95
(a) Load Factor 61.73% 60.24% 59.57% 58.24%
(b) Loss Ratio 6.90% 7.35% 7.32% 6.53%
(c) Capacity Utilisation 28.51% 30.35% 28.55% 31.12%

Statistics

(Electricity (Information Disclosure) Regulations 1994 First Schedule Part III 2)

(a) System Length Break Down

1997/98 1996/97 1995/96 1994/95
33kV 258.9 km 257.9 km 257.7 km 257.3 km
11kV 2,078.0 km 1,957.3 km 1,910.7 km 1,895.0 km
6.6kV 51.1 km 51.1 km 51.2 km ...
LV 472.0 km 284.8 km 274.4 km 51.1 km
Total 2,860.0 km 2,521.3 km 2,494.0 km 2484.0 km


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 168


NZLII PDF NZ Gazette 1998, No 168





✨ LLM interpretation of page content

πŸ—οΈ Marlborough Electric Limited Performance Measures

πŸ—οΈ Infrastructure & Public Works
Electricity, Performance Measures, Financial, Efficiency, Energy Delivery, Statistics