✨ Electricity Reliability Performance Measures




FIRST SCHEDULE - PART IV continued

Reliability Performance Measures continued

1998 1997 1996 1995

Faults

  1. Total number of faults per 100 circuit kilometers of prescribed voltage electric line

    12.01 | 15.17 | 13.42 | 12.70

  2. Number of faults per 100 circuit kilometers of prescribed voltage underground cables.

    | 6.6kV | 1.86 | 0.93 | 0.93 | 0.93 |
    | 11kV | 8.70 | 10.24 | 7.14 | 5.26 |
    | 22kV | 3.60 | 2.40 | 4.81 | 2.41 |
    | 33kV | 8.13 | 4.55 | 1.14 | 3.41 |
    | 110kV | 13.14 | 14.79 | 4.93 | 3.29 |
    | Total | 7.48 | 8.00 | 5.64 | 4.24 |

  3. Number of faults per 100 circuit kilometers of prescribed voltage overhead lines.

    | 6.6kV | 5.33 | 7.20 | 7.07 | 10.10 |
    | 11kV | 23.16 | 29.75 | 30.05 | 30.30 |
    | 22kV | 0.07 | - | - | - |
    | 33kV | 4.64 | 34.02 | 4.64 | 13.92 |
    | 110kV | - | - | - | - |
    | Total | 21.11 | 28.36 | 27.61 | 28.02 |

28 SEPTEMBER

THE NEW ZEALAND GAZETTE



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 160


NZLII PDF NZ Gazette 1998, No 160





✨ LLM interpretation of page content

πŸ—οΈ Reliability Performance Measures for Electricity Interruptions (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Electricity, Faults, Reliability, Performance Measures, Statistics