✨ Electricity Statistics




FIRST SCHEDULE - PART III continued

  1. Statistics continued
1998 1997 1996 1995
(d) Transformer capacity 2,657.45 MVA 2,613.45 MVA 2,835.24 MVA
(e) Maximum demand (in kilowatts) 934,154 kW 939,662 kW 851,656 kW
(f) Total electricity supplied from the system (in kilowatt hours) 4,432,166,623 kWh 4,367,119,190 kWh 4,453,647,269 kWh
(g) Total amount of electricity (in kilowatt hours) conveyed through the system on behalf of other persons, that are electricity retailers or generators, not being persons that are in a prescribed business relationship with Mercury Energy 244,212,463 kWh 107,232,001 kWh 24,953,175 kWh
(h) Total customers (average) 251,155 246,684 243,765

FIRST SCHEDULE - PART IV

Reliability Performance Measures

Interruptions

  1. Total number of Interruptions according to class:
Class Description 1998 1997 1996 1995
A Planned Trans Power interruption - - - -
B Planned interruption by a Line Operator (other than Trans Power) 274 104 239 454
C Unplanned interruption originating within the principal Line Owners works 490 662 475 466
D Unplanned Trans Power interruption 6 8 48 2
E Unplanned ECNZ interruption - - - -
F Unplanned interruption originating from a generator other than ECNZ - - - -
G Other - - - -

Total | 770 | 774 | 762 | 922 |

THE NEW ZEALAND GAZETTE

No. 160



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 160


NZLII PDF NZ Gazette 1998, No 160





✨ LLM interpretation of page content

πŸ—οΈ Electricity System Statistics (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Electricity, Transformer Capacity, Maximum Demand, Electricity Supplied, Conveyed Electricity, Customers, Statistics

πŸ—οΈ Reliability Performance Measures for Electricity Interruptions

πŸ—οΈ Infrastructure & Public Works
Electricity, Interruptions, Reliability, Performance Measures, Statistics