18 SEPTEMBER NEW ZEALAND GAZETTE 3617

Reliability Performance Measures for the Year Ended 31 March 1996

Consumer Connections Line 33kV Line 11kV Line 6.6kV Cable 33kV Cable 11kV Cable 6.6kV Total Density Con/km
At start of period 49,730 149.9 235.8 485.0 75.2 20.2 228.7 1,195
At end of period 49,837 149.9 236.5 488.1 75.2 20.4 229.5 1,200
Average Totals 49,784 149.9 236.1 486.6 75.2 20.3 229.1 1,197

Totals

| | | | 872.6 | | | 324.6 | 1,197 |

Reliability Measure SAIDI Cons Mins SAIDI Mins/Cons SAIFI Cons Int SAIFI Int/Cons CAIDI Mins/Int No of Interruptions Class
Distributor Planned 68,570 1.38 1,230 0.02 55.70 10 B
Distributor Unplanned 897,355 18.03 28,058 0.56 32.00 91 C
Subtotal 965,925 19.40 29,288 0.59 33.00 101
Transpower Planned - - - - - - A
Transpower Unplanned - - - - - - D
Subtotal - - - - - -
ECNZ Planned - - - - - - E
ECNZ Unplanned - - - - - -
Subtotal - - - - - -
Other Gen Planned - - - - - - F
Other Gen Unplanned - - - - - - G
Other Than Above - - - - - -
Subtotal - - - - - -
TOTAL 965,925 19.40 29,288 0.59 33.00 101
Faults by Voltage OH Faults OH Length km OH per 100 km Cable Faults UG Length km UG per 100 km
33kV 6 149.9 4.0 4 75.2 5.3
11kV 43 236.1 18.2 2 20.3 9.9
6.6kV 36 486.6 7.4 4 229.1 1.7
TOTAL 85 872.6 9.7 10 324.6 3.1
Total Lines and Cables Total Faults Total Length in km Faults per 100 km
95 1,197 7.9


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1998, No 149


NZLII PDF NZ Gazette 1998, No 149





✨ LLM interpretation of page content

🏭 Reliability Performance Measures for Electricity Sector (continued from previous page)

🏭 Trade, Customs & Industry
Reliability Measures, Performance, Electricity Sector, Consumer Connections, Faults