β¨ Electricity Reliability Statistics
2090 NEW ZEALAND GAZETTE No. 87
Detailed shutdown analysis:
-
Total Interruptions
33kV Overhead
33kV Underground
11kV Overhead
11kV Underground1996/97
Unplanned [Class C] Planned [Class B]
303 372
15 7
2 0
226 305
60 601995/96
Unplanned [Class C] Planned [[Class B]
222 308
11 0
0 0
161 272
50 361994/95
Unplanned [Class C] Planned [Class B]
287 400
12 0
0 0
234 343
41 57 -
Total faults per 100km of line
1996/97 1995/96 1994/95
12.74 9.35 12.46 -
Faults per 100km of underground line:
33kV
11kV1996/97 1995/96 1994/95
18.56 15.15 12.8
10.53 0 0
19.05 16.50 13.50 -
Faults per 100km of overhead lines
33kV
11kV1996/97 1995/96 1994/95
11.74 8.41 12.4
6.61 4.85 5.29
12.38 9.17 13.32
SYSTEM AVERAGE INTERRUPTION DURATION INDEX [SAIDI]
-
Total Interruptions
1996/97 1995/96 1994/95
164.4 111.8 172 -
Class A
Class B
Class C
Class D
Class E
Class F
Class G1996/97 1995/96 1994/95
0 0 0
49.36 39.60 49.60
115.05 72.20 122.40
0 0 0
0 0 0
0 0 0
0 0 0
SYSTEM AVERAGE INTERRUPTION FREQUENCY INDEX [SAIFI]
-
Total Interruptions
1996/97 1995/96 1994/95
3.13 1.97 3.08 -
Class A
Class B
Class C
Class D
Class E
Class F
Class G1996/97 1995/96 1994/95
0 0 0
0.42 0.35 0.53
2.71 1.62 2.55
0 0 0
0 0 0
0 0 0
0 0 0
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 87
NZLII —
NZ Gazette 1997, No 87
β¨ LLM interpretation of page content
ποΈ
Reliability Performance Measure for 1995/96
(continued from previous page)
ποΈ Infrastructure & Public WorksElectricity, Shutdowns, Planned, Unplanned, Reliability, Transpower, Distribution System, ECNZ