12 AUGUST NEW ZEALAND GAZETTE 2089
ELECTRICITY [Information Disclosure] REGULATIONS 1994
PART III - Energy Delivery Efficiency Performance Measures and Statistics
1. Energy Delivery Efficiency Performance Measures
| 1996/97 | 1995/96 | 1994/95 | |
|---|---|---|---|
| % | % | % | |
| a) Load Factor | 56.76 | 57.13 | 58.29 |
| b) Loss Ratio | 5.64 | 5.55 | 5.22 |
| c) Capacity Utilisation | 30.27 | 29.08 | 29.02 |
2. Statistics
| 1996/97 | 1995/96 | 1994/95 | |
|---|---|---|---|
| km | km | km | |
| a) System length [total] | 3,643 | 3,621 | 3,532 |
| 33kV line length | 246 | 246 | 244 |
| 11kV line length | 2,141 | 2,127 | 2,059 |
| 230/400V line length | 1,256 | 1,248 | 1,229 |
| b) Overhead [total] | 2,693 | 2,682 | 2,619 |
| 33kV | 227 | 227 | 227 |
| 11kV | 1,826 | 1,816 | 1,756 |
| 230/400V | 641 | 639 | 636 |
| c) Underground [total] | 949 | 939 | 913 |
| 33kV | 19 | 19 | 17 |
| 11kV | 315 | 311 | 303 |
| 230/400V | 616 | 609 | 593 |
| d) Transformer capacity [kVA] | 511,712 | 502,791 | 495,850 |
| e) Maximum demand [kW] | 154,872 | 148,823 | 143,916 |
| f) Total electricity supplied | |||
| from system [kWh] | 726,702,135 | 706,214,060 | 696,245,703 |
| g) Total electricity conveyed | |||
| through system for others | 22,700,307 | 3,122,420 | Nil |
| h) Customers | 55,740 | 54,907 | 53,931 |
PART IV Reliability Performance Measure for 1995/96
The Interruption Disclosure requirements are stated as:
| Class | 1996/97 | 1995/96 | 1994/95 |
|---|---|---|---|
| Class A Planned shutdown caused by Transpower | 0 | 0 | 0 |
| Class B " caused by Distribution system | 372 | 308 | 400 |
| Class C Unplanned shutdown caused by Distribution system | 303 | 222 | 287 |
| Class D " caused by Transpower | 0 | 0 | 0 |
| Class E Unplanned caused by ECNZ as generator | 0 | 0 | 0 |
| Class F " Generation not ECNZ | 0 | 0 | 0 |
| Class G Planned or unplanned shutdown any other cause | 0 | 0 | 0 |
TOTAL SHUTDOWNS | 675 | 530 | 687 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 87
NZLII —
NZ Gazette 1997, No 87
β¨ LLM interpretation of page content
ποΈ Energy Delivery Efficiency Performance Measures
ποΈ Infrastructure & Public WorksElectricity, Load Factor, Loss Ratio, Capacity Utilisation, Statistics
ποΈ Electricity System Statistics
ποΈ Infrastructure & Public WorksElectricity, System Length, Overhead Lines, Underground Lines, Transformer Capacity, Maximum Demand, Electricity Supply, Customers
ποΈ Reliability Performance Measure for 1995/96
ποΈ Infrastructure & Public WorksElectricity, Shutdowns, Planned, Unplanned, Reliability, Transpower, Distribution System, ECNZ