✨ Electricity Regulations Statistics




12 AUGUST NEW ZEALAND GAZETTE 2089

ELECTRICITY [Information Disclosure] REGULATIONS 1994

PART III - Energy Delivery Efficiency Performance Measures and Statistics

1. Energy Delivery Efficiency Performance Measures

1996/97 1995/96 1994/95
% % %
a) Load Factor 56.76 57.13 58.29
b) Loss Ratio 5.64 5.55 5.22
c) Capacity Utilisation 30.27 29.08 29.02

2. Statistics

1996/97 1995/96 1994/95
km km km
a) System length [total] 3,643 3,621 3,532
33kV line length 246 246 244
11kV line length 2,141 2,127 2,059
230/400V line length 1,256 1,248 1,229
b) Overhead [total] 2,693 2,682 2,619
33kV 227 227 227
11kV 1,826 1,816 1,756
230/400V 641 639 636
c) Underground [total] 949 939 913
33kV 19 19 17
11kV 315 311 303
230/400V 616 609 593
d) Transformer capacity [kVA] 511,712 502,791 495,850
e) Maximum demand [kW] 154,872 148,823 143,916
f) Total electricity supplied
from system [kWh] 726,702,135 706,214,060 696,245,703
g) Total electricity conveyed
through system for others 22,700,307 3,122,420 Nil
h) Customers 55,740 54,907 53,931

PART IV Reliability Performance Measure for 1995/96

The Interruption Disclosure requirements are stated as:

Class 1996/97 1995/96 1994/95
Class A Planned shutdown caused by Transpower 0 0 0
Class B " caused by Distribution system 372 308 400
Class C Unplanned shutdown caused by Distribution system 303 222 287
Class D " caused by Transpower 0 0 0
Class E Unplanned caused by ECNZ as generator 0 0 0
Class F " Generation not ECNZ 0 0 0
Class G Planned or unplanned shutdown any other cause 0 0 0

TOTAL SHUTDOWNS | 675 | 530 | 687 |



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 87


NZLII PDF NZ Gazette 1997, No 87





✨ LLM interpretation of page content

πŸ—οΈ Energy Delivery Efficiency Performance Measures

πŸ—οΈ Infrastructure & Public Works
Electricity, Load Factor, Loss Ratio, Capacity Utilisation, Statistics

πŸ—οΈ Electricity System Statistics

πŸ—οΈ Infrastructure & Public Works
Electricity, System Length, Overhead Lines, Underground Lines, Transformer Capacity, Maximum Demand, Electricity Supply, Customers

πŸ—οΈ Reliability Performance Measure for 1995/96

πŸ—οΈ Infrastructure & Public Works
Electricity, Shutdowns, Planned, Unplanned, Reliability, Transpower, Distribution System, ECNZ