2862 NEW ZEALAND GAZETTE No. 120
(c) Underground Line Length
| Nominal Voltage | 1997 Powerco U/G Line Length (km) | 1996 Powerco U/G Line Length (km) | 1995 Taranaki Energy U/G Line Length (km) | 1995 Powerco U/G Line Length (km) |
|---|---|---|---|---|
| 33kV | 9.68 | 9.55 | 7.00 | 2.00 |
| 22kV | 0.19 | 0.19 | 0.00 | 0.00 |
| 11kV | 163.68 | 161.16 | 117.00 | 40.00 |
| 6.6kV | 17.36 | 17.10 | 17.00 | 0.00 |
| 230/400V | 368.68 | 362.97 | 242.00 | 119.00 |
| Total | 559.59 | 550.97 | 383.00 | 161.00 |
(d) Transformer Capacity (kVA)
| 1997 Powerco | 1996 Powerco | 1995 Taranaki Energy | 1995 Powerco | |
|---|---|---|---|---|
| 568,319 | 629,659 | 304,062 | 265,080 |
(e) Maximum Demand (kW)
| 1997 Powerco | 1996 Powerco | 1995 Taranaki Energy | 1995 Powerco | |
|---|---|---|---|---|
| 177,311 | 182,520 | 97,688 | 72,162 |
(f) Total Electricity Supplied From System (kWh)
| 1997 Powerco | 1996 Powerco | 1995 Taranaki Energy | 1995 Powerco | |
|---|---|---|---|---|
| 849,103,244 | 864,631,066 | 466,951,236 | 347,049,291 |
(g) Total Electricity Conveyed Through System On Behalf Of Other Electricity Retailers (kWh)
| 1997 Powerco | 1996 Powerco | 1995 Taranaki Energy | 1995 Powerco | |
|---|---|---|---|---|
| 17,821,943 | 39,360,065 | 349,131 | Nil |
(h) Total Customers
| 1997 Powerco | 1996 Powerco | 1995 Taranaki Energy | 1995 Powerco | |
|---|---|---|---|---|
| 71,730 | 72,407 | 39,467 | 33,161 |
28 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 16 AND PART IV OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
28.1 Total Number Of Interruptions
| Interruption Class | 1997 Powerco Number of Interruptions | 1996 Powerco Number of Interruptions | 1995 Taranaki Energy Number of Interruptions | 1995 Powerco Number of Interruptions |
|---|---|---|---|---|
| Class A - Transpower Planned | 3.00 | 4.00 | 0.00 | 5.00 |
| Class B - Distributor Planned | 406.00 | 397.00 | 312.00 | 100.00 |
| Class C - Distributor Unplanned | 499.00 | 670.00 | 533.00 | 360.00 |
| Class D - Transpower Unplanned | 5.00 | 17.00 | 2.00 | 12.00 |
| Class E - ECNZ Unplanned | 0.00 | 0.00 | 0.00 | 0.00 |
| Class F - Other Generator Unplanned | 2.00 | 0.00 | 0.00 | 0.00 |
| Class G - Other (Not in A to F) | 0.00 | 0.00 | 0.00 | 0.00 |
| Total | 915.00 | 1088.00 | 847.00 | 477.00 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 120
NZLII —
NZ Gazette 1997, No 120
β¨ LLM interpretation of page content
π
Disclosure of Performance Measures pursuant to Regulation 16 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1994