✨ Electricity Performance Measures




2862 NEW ZEALAND GAZETTE No. 120

(c) Underground Line Length

Nominal Voltage 1997 Powerco U/G Line Length (km) 1996 Powerco U/G Line Length (km) 1995 Taranaki Energy U/G Line Length (km) 1995 Powerco U/G Line Length (km)
33kV 9.68 9.55 7.00 2.00
22kV 0.19 0.19 0.00 0.00
11kV 163.68 161.16 117.00 40.00
6.6kV 17.36 17.10 17.00 0.00
230/400V 368.68 362.97 242.00 119.00
Total 559.59 550.97 383.00 161.00

(d) Transformer Capacity (kVA)

1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
568,319 629,659 304,062 265,080

(e) Maximum Demand (kW)

1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
177,311 182,520 97,688 72,162

(f) Total Electricity Supplied From System (kWh)

1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
849,103,244 864,631,066 466,951,236 347,049,291

(g) Total Electricity Conveyed Through System On Behalf Of Other Electricity Retailers (kWh)

1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
17,821,943 39,360,065 349,131 Nil

(h) Total Customers

1997 Powerco 1996 Powerco 1995 Taranaki Energy 1995 Powerco
71,730 72,407 39,467 33,161

28 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 16 AND PART IV OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

28.1 Total Number Of Interruptions

Interruption Class 1997 Powerco Number of Interruptions 1996 Powerco Number of Interruptions 1995 Taranaki Energy Number of Interruptions 1995 Powerco Number of Interruptions
Class A - Transpower Planned 3.00 4.00 0.00 5.00
Class B - Distributor Planned 406.00 397.00 312.00 100.00
Class C - Distributor Unplanned 499.00 670.00 533.00 360.00
Class D - Transpower Unplanned 5.00 17.00 2.00 12.00
Class E - ECNZ Unplanned 0.00 0.00 0.00 0.00
Class F - Other Generator Unplanned 2.00 0.00 0.00 0.00
Class G - Other (Not in A to F) 0.00 0.00 0.00 0.00
Total 915.00 1088.00 847.00 477.00


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1997, No 120


NZLII PDF NZ Gazette 1997, No 120





✨ LLM interpretation of page content

🏭 Disclosure of Performance Measures pursuant to Regulation 16 and Part IV of the First Schedule of the Electricity (Information Disclosure) Regulations 1994 (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Performance Measures, Disclosure, Regulation 16, Powerco, Taranaki Energy