26 DISCLOSURE OF OPTIMAL DEPRIVAL VALUE (ODV) PURSUANT TO REGULATION 14 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
ODV as at 31 March 1997 $130,663,575
27 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 15 AND PART III OF THE FIRST SCHEDULE OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
27.1
| 1997 Powerco | 1996 Powerco | 1995 Taranaki Energy | 1995 Powerco | |
|---|---|---|---|---|
| (a) Load Factor | 58.03% | 60.29% | 58.10% | 58.13% |
| (b) Loss Ratio | 5.99% | 6.48% | 6.20% | 6.15% |
| (c) Capacity Utilisation | 31.19% | 28.99% | 32.10% | 28.22% |
27.2 (a) System Length
| Nominal Voltage | 1997 Powerco Total System Length (km) | 1996 Powerco Total System Length (km) | 1995 Taranaki Energy Total System Length (km) | 1995 Powerco Total System Length (km) |
|---|---|---|---|---|
| 33kV | 417.09 | 411.84 | 273.00 | 179.00 |
| 22kV | 113.26 | 114.10 | 0.00 | 61.00 |
| 11kV | 3870.98 | 3776.73 | 1339.00 | 2426.00 |
| 6.6kV | 857.03 | 986.44 | 895.00 | 97.00 |
| 230/400V | 2075.76 | 2072.18 | 1348.00 | 724.00 |
| Total | 7334.12 | 7361.29 | 3855.00 | 3487.00 |
27.2 (b) Overhead Line Length
| Nominal Voltage | 1997 Powerco O/H Line Length (km) | 1996 Powerco O/H Line Length (km) | 1995 Taranaki Energy O/H Line Length (km) | 1995 Powerco O/H Line Length (km) |
|---|---|---|---|---|
| 33kV | 407.41 | 402.29 | 266.00 | 177.00 |
| 22kV | 113.07 | 113.91 | 0.00 | 61.00 |
| 11kV | 3707.30 | 3615.57 | 1222.00 | 2386.00 |
| 6.6kV | 839.67 | 969.34 | 878.00 | 97.00 |
| 230/400V | 1707.08 | 1709.21 | 1106.00 | 605.00 |
| Total | 6774.53 | 6810.32 | 3472.00 | 3326.00 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1997, No 120
NZLII —
NZ Gazette 1997, No 120
β¨ LLM interpretation of page content
π Disclosure of Optimal Deprival Value (ODV) pursuant to Regulation 14 of the Electricity (Information Disclosure) Regulations 1994
π Trade, Customs & IndustryElectricity, Optimal Deprival Value, Disclosure, Regulation 14
π Disclosure of Performance Measures pursuant to Regulation 15 and Part III of the First Schedule of the Electricity (Information Disclosure) Regulations 1994
π Trade, Customs & IndustryElectricity, Performance Measures, Disclosure, Regulation 15