β¨ Electricity Reliability Statistics
29 NOVEMBER NEW ZEALAND GAZETTE 4575
Part V
Reliability Performance Measures To Be Disclosed By Trans Power
(Disclosure Under Regulation 17)
-
Total number of unplanned interruptions
Resulting from 97 loss of supply incidents in 1995-96... 229 184 234 -
Electricity customer interruptions in system minutes... 12.2 19.5 15.1
- planned... 5.8 4.4 5.6
- unplanned... 6.4 15.1 9.5
-
Underlying electricity customer interruptions in system minutes... 7.1 14.1 10.3
Underlying interruptions are those interruptions of 1 system minute or less duration- planned... 3.1 2.9 4.3
- unplanned... 4.0 11.2 6.0
-
Average supply reliability... 99.9963% 99.9942% 99.9956%
Measured by the energy supplied divided by the sum of the energy supplied and not supplied -
Uneconomic generation due to planned and unplanned transmission system unavailability... 0.81% 0.68% 0.81%
Uneconomic generation relates to the amount of electricity generated from any source other than the most economic source. -
Uneconomic generation due to HVDC system unavailability... 0.73% 0.60% 0.69%
-
Uneconomic generation due to unplanned transmission system unavailability... 0.22% 0.15% 0.07%
-
Planned interruption restoration performance... 80.5% 92.5% 76.6%
-
Unplanned interruption response... 99.1% 100% 99.6%
The information compiled using estimated information includes Part V sections 2,3,4,5,6 and 7.
The methodology used to calculate the estimated information is documented and available from Trans Power upon request.
- These figures have been changed from those published in the the 1994/95 gazetted information, where two supply voltages at the same station are both interrupted this is now counted as two interruptions and not one as previously.
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 173
NZLII —
NZ Gazette 1996, No 173
β¨ LLM interpretation of page content
π
Electricity Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryElectricity, Reliability, Interruptions, Transmission, HVDC, Performance Measures, Statistics