β¨ Energy Performance Statistics
MERCURY ENERGY LIMITED & SUBSIDIARIES
PERFORMANCE MEASURES AND STATISTICS
FOR THE YEAR ENDED 31 MARCH 1996 continued
30 OCTOBER
- The SAIDI for the total interruptions within each interruption class.
| Class | 1996 | 1995 | |
|---|---|---|---|
| Class A | Planned Transport interruption | - | - |
| Class B | Planned interruption by any Line Operator (other than TransPower) | 21.07 | 39.73 |
| Class C | Unplanned interruption originating within the principal Line Owners works | 94.71 | 82.48 |
| Class D | Unplanned TransPower interruption | 5.00 | 3.63 |
| Class E | Unplanned ECNZ interruption | - | - |
| Class F | Unplanned interruption originating from a generator other than ECNZ | - | - |
| Class G | Other | - | - |
- The SAIFI (System Average Interruption Frequency Index)
| 1996 | 1995 | |
|---|---|---|
| The SAIFI for the total interruptions | 1.95 | 1.78 |
- The SAIFI for the total interruptions within each interruption class.
| Class | 1996 | 1995 | |
|---|---|---|---|
| Class A | Planned TransPower interruption | - | - |
| Class B | Planned interruption by any Line Operator (other than TransPower) | 0.16 | 0.33 |
| Class C | Unplanned interruption originating within the principal Line Owners works | 1.75 | 1.31 |
| Class D | Unplanned TransPower interruption | 0.05 | 0.14 |
| Class E | Unplanned ECNZ interruption | - | - |
| Class F | Unplanned interruption originating from a generator other than ECNZ | - | - |
| Class G | Other | - | - |
NEW ZEALAND GAZETTE
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 158
NZLII —
NZ Gazette 1996, No 158
β¨ LLM interpretation of page content
ποΈ
Performance Measures and Statistics for Mercury Energy Limited
(continued from previous page)
ποΈ Infrastructure & Public WorksPerformance, Faults, Statistics, Mercury Energy, SAIDI, SAIFI