β¨ Performance Measures and Statistics
MERCURY ENERGY
MERCURY ENERGY LIMITED & SUBSIDIARIES
PERFORMANCE MEASURES AND STATISTICS
FOR THE YEAR ENDED 31 MARCH 1996 continued
Faults
- Total number of faults per 100 circuit kilometers of prescribed voltage electric lines
| 1996 | 1995 | |
|---|---|---|
| 13.42 | 12.7 |
- Number of faults per 100 circuit kilometers of prescribed voltage underground cables.
| 6.6kV | 11kV | 22kV | 33kV | 110kV | Total | |
|---|---|---|---|---|---|---|
| 1996 | 0.93 | 7.14 | 4.81 | 1.14 | 4.93 | 5.64 |
| 1995 | 0.93 | 5.26 | 2.41 | 3.41 | 3.29 | 4.24 |
- Number of faults per 100 circuit kilometers of prescribed voltage overhead lines.
| 6.6kV | 11kV | 22kV | 33kV | 110kV | Total | |
|---|---|---|---|---|---|---|
| 1996 | 7.07 | 30.05 | - | 4.64 | - | 27.61 |
| 1995 | 10.10 | 30.30 | - | 13.92 | - | 28.02 |
SAIDI (System Average Interruption Duration Index)
- The SAIDI for the total interruptions.
| 1996 | 1995 | |
|---|---|---|
| 120.77 | 125.83 |
NEW ZEALAND GAZETTE
No. 158
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 158
NZLII —
NZ Gazette 1996, No 158
β¨ LLM interpretation of page content
ποΈ
Performance Measures and Statistics for Mercury Energy Limited
(continued from previous page)
ποΈ Infrastructure & Public WorksPerformance, Faults, Statistics, Mercury Energy, SAIDI