✨ Performance Measures and Statistics




MERCURY ENERGY

MERCURY ENERGY LIMITED & SUBSIDIARIES

PERFORMANCE MEASURES AND STATISTICS
FOR THE YEAR ENDED 31 MARCH 1996 continued

Faults

  1. Total number of faults per 100 circuit kilometers of prescribed voltage electric lines
1996 1995
13.42 12.7
  1. Number of faults per 100 circuit kilometers of prescribed voltage underground cables.
6.6kV 11kV 22kV 33kV 110kV Total
1996 0.93 7.14 4.81 1.14 4.93 5.64
1995 0.93 5.26 2.41 3.41 3.29 4.24
  1. Number of faults per 100 circuit kilometers of prescribed voltage overhead lines.
6.6kV 11kV 22kV 33kV 110kV Total
1996 7.07 30.05 - 4.64 - 27.61
1995 10.10 30.30 - 13.92 - 28.02

SAIDI (System Average Interruption Duration Index)

  1. The SAIDI for the total interruptions.
1996 1995
120.77 125.83

NEW ZEALAND GAZETTE

No. 158



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 158


NZLII PDF NZ Gazette 1996, No 158





✨ LLM interpretation of page content

πŸ—οΈ Performance Measures and Statistics for Mercury Energy Limited (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Performance, Faults, Statistics, Mercury Energy, SAIDI