✨ Energy Reliability Performance Measures




3508
NEW ZEALAND GAZETTE
No. 145

CAPITAL POWER LIMITED

Disclosure of Reliability Performance Measures Pursuant to Regulation 16 and Part II of the First Schedule of the Electricity (Information Disclosure) Regulations 1998

Reliability Performance Measures Period : 1 April 1995 - 31 March 1996
Note: Interruption duration factor is sum of customers affected by time of interruption (in minutes).

Total Number of interruptions (above 3.3kV) Duration Factor Customers affected
Planned interruption by Trans Power Class A 0 0
Planned interruption by Capital Power Class B 42 144,048 5,873
Unplanned interruption within Capital Power Network Class C 51 318,786 4,778
Unplanned interruption by Trans Power Class D 4 1,146,360 95,234
Unplanned interruption in generation by ECNZ Class E 0 0 0
Unplanned interruption by other generator Class F 0 0 0
Other interruptions Class G 0 0 0
Total 97 1,609,194 105,885

1994/5
0
55
58
4
0
0
0
117

Total number of faults per 100 circuit kilometres of prescribed voltage electric line. Total per 100km
33kV 1 1.38
11kV 50 12.30
Sum 51 10.64

0
14.37
12.18

Total number of faults per 100 circuit kilometres underground, by prescribed voltage Total per 100km
33kV 0 0.00
11kV 17 4.78
Sum 17 3.76

0
7.44
6.23

Total number of faults per 100 circuit kilometres overhead, by prescribed voltage Total per 100km
33kV 0 0.0
11kV 33 122.2
Sum 33 122.22

0.00
111.11
111.11



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 145


NZLII PDF NZ Gazette 1996, No 145





✨ LLM interpretation of page content

🏭 Disclosure of Reliability Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Reliability, Performance Measures, Electricity Disclosure, Capital Power Limited, Statistics