✨ Electricity Disclosure Statistics




11 OCTOBER NEW ZEALAND GAZETTE 3507

CAPITAL POWER LIMITED

Disclosure of Energy Delivery Efficiency Performance Measures and Statistics
Pursuant to Regulation 15 and Part II of the First Schedule of the Electricity (Information Disclosure) Regulations 1994.

Energy Delivery Efficiency Performance Measures: Period : 1 April 1995 - 31 March 1996

1995/6 1994/5
Load Factor: a / (b x c) x 100 / 1 = 55.11% 52.40%
Loss ratio: a / b x 100 / 1 = 3.98% 3.80%
Capacity Utilisation: a / b x 100 / 1 = 40.14% 39.70%

Statistics - Period : 1 April 1995 - 31 March 1996

Kilometres 1994/5 Kilometres
33kV
System length breakdown 72.7 72.7
Underground circuit length 72.7 72.7
Overhead circuit length 0 0
11kV
System length breakdown 406.6 403.6
Underground circuit length 379.6 376.6
Overhead circuit length 27 27
400V
System length breakdown 772.9 769.5
Underground circuit length 453.9 450
Overhead circuit length 319 319.5
Total
System length breakdown 1252.2 1245.8
Underground circuit length 906.2 899.3
Overhead circuit length 346 346.5
Transformer capacity 551,865 539,015 kVA
Maximum demand 221,500 209,100 kilowatts
Total electricity supplied 1,021,016,239 976,310,000 kilowatt-hours
Total electricity conveyed for non-associated parties 5,100,000 0 kilowatt-hours
Total customers 55,800 55,831


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 145


NZLII PDF NZ Gazette 1996, No 145





✨ LLM interpretation of page content

🏭 Disclosure of Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery, Efficiency Performance, Electricity Disclosure, Capital Power Limited, Statistics