Electricity Performance Measures




NEW ZEALAND GAZETTE

No. 141

COUNTIES POWER LIMITED

DISCLOSURE OF ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS PURSUANT TO REGULATION 15 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

Period 1/4/94 to 31/3/95

  1. Energy delivery efficiency performance measures
    (a) Load factor 57.6%
    (b) Loss ratio 8.4%
    (c) Capacity utilisation 35.5%

  2. Statistics
    (a) System length, broken down by voltage

    • 33 kV 173 km
    • 22 kV 22 km
    • 11 kV 1445 km
    • 400V 1257 km
    • Total 2897 km

    (b) Circuit length of overhead lines, broken down by voltage

    • 33 kV 173 km
    • 22 kV 22 km
    • 11 kV 1423 km
    • 400V 1104 km
    • Total 2722 km

    (c) Circuit length of underground cables, broken down by voltage

    • 11 kV 22 km
    • 400V 153 km
    • Total 175 km

    (d) Transformer capacity 197,246 kVA
    (e) Maximum demand 70,055 kW
    (f) Total electricity supplied from the system 324,626,697 kWh
    (g) Total electricity conveyed through the system NIL
    (h) Total customers 29049 (average for period)

  3. Total number of faults per 100 circuit kilometres of prescribed voltage electric line

    • 11.93
  4. Total number of faults per 100 circuit kilometres of underground prescribed voltage line and per different nominal line voltages:

    • 11 kV underground 4.55

    Total 4.55

  5. Total number of faults per 100 circuit kilometres of overhead prescribed voltage line and per different nominal line voltages:

    • 11 kV overhead 13.28
    • 22 kV overhead 22.73
    • 33 kV overhead 2.31

    Total 12.24

  6. The SAIDI for the total of interruptions 464.42 minutes

  7. The SAIDI for the total number of interruptions within each interruption class:
    (a) Planned interruptions by TransPower 0 minutes
    (b) Planned interruptions by Counties Power 179.74 minutes
    (c) Unplanned interruptions originating within Counties Power system 283.40 minutes
    (d) Unplanned interruptions originating with TransPower system 1.28 minutes

  8. The SAIFI for the total number of interruptions 5.19 interruptions

  9. The SAIFI for the total number of interruptions within each interruption class:
    (a) Planned interruptions by TransPower 0 interruptions
    (b) Planned interruptions by Counties Power 1.08 interruptions
    (c) Unplanned interruptions originating within Counties Power system 4.06 interruptions
    (d) Unplanned interruptions originating with TransPower system 0.05 interruptions

  10. The CAIDI for the total of all interruptions 89.5 minutes

  11. The CAIDI for the total number of interruptions within each interruption class:
    (a) Planned interruptions by TransPower 0 minutes
    (b) Planned interruptions by Counties Power 166.6 minutes
    (c) Unplanned interruptions originating within Counties Power system 69.8 minutes
    (d) Unplanned interruptions originating with TransPower system 25 minutes

DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES PURSUANT TO REGULATION 16 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

Period 1/4/94 to 31/3/95

  1. Total number of interruptions 511
    (a) Planned interruptions by TransPower 0
    (b) Planned interruptions by Counties Power 312
    (c) Unplanned interruptions originating within Counties Power system 198
    (d) Unplanned interruptions originating with TransPower system 1
    (e) Unplanned interruptions originating with E.C.N.Z. NIL
    (f) Unplanned interruptions originating with generators other than E.C.N.Z. NIL
    (g) Interruptions not included in (f) NIL

*Detail of planned interruptions to Counties Power system were only kept for the last 6 months of the year. Extrapolation has been used to determine an annual figure.

Number of customers has been calculated as the average of opening and closing figures for the year.*

PUBLISHED BY AUTHORITY OF DEPARTMENT OF INTERNAL AFFAIRS:
GP PRINT LIMITED, WELLINGTON, NEW ZEALAND—1996

Price $2.30 (inc. G.S.T.) ISSN 0111-5450


PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 141


NZLII PDF NZ Gazette 1996, No 141





✨ LLM interpretation of page content

🏭 Disclosure of Energy Efficiency Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Energy Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, Statistics, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply, Faults, SAIDI, SAIFI, CAIDI

🏭 Disclosure of Reliability Performance Measures

🏭 Trade, Customs & Industry
Electricity, Reliability Measures, Interruptions, Faults, Planned Interruptions, Unplanned Interruptions, SAIDI, SAIFI, CAIDI