Electricity Performance Measures




7 OCTOBER

NEW ZEALAND GAZETTE

1 April 1995 to 31 March 1996

1996 | 1995

DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES PURSUANT TO REGULATION 16 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

1. Financial Performance Measures

(a) Accounting Return on total assets, being earnings before interest and tax, divided by average total funds employed

3.1% | 3.0%

(b) Accounting return on equity, being net profit after tax, divided by average total shareholders’ funds

2.1% | 2.1%

(c) Accounting rate of profit

2.3% | 1.5%

2. Efficiency Performance Measures

a) Direct line cost per kilometre

$1091 | $1067

b) Indirect line cost per electricity customer

$96 | $87

(includes line business allocation of billing and customer liaison costs).


COUNTIES POWER LIMITED

DISCLOSURE OF ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS PURSUANT TO REGULATION 15 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

Period 1/4/95 to 31/3/96

1. Energy delivery efficiency performance measures

(a) Load factor

57.1%

(b) Loss ratio

8.2%

(c) Capacity utilisation

37.8%

2. Statistics

(a) System length, broken down by voltage

  • 33 kV: 173 km
  • 22 kV: 22 km
  • 11 kV: 1477 km
  • 400V: 1262 km
  • Total: 2934 km

(b) Circuit length of overhead lines, broken down by voltage

  • 33 kV: 173 km
  • 22 kV: 22 km
  • 11 kV: 1454 km
  • 400V: 1104 km
  • Total: 2753 km

(c) Circuit length of underground cables, broken down by voltage

  • 11 kV: 23 km
  • 400V: 158 km
  • Total: 181 km

(d) Transformer capacity

197,000 kVA

(e) Maximum demand

79,493 kW

(f) Total electricity supplied from the system

373,099,000 kWh

(g) Total electricity conveyed through the system

1,477,600 kWh

(h) Total customers

29860 average for period


DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES PURSUANT TO REGULATION 16 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

Period 1/4/95 to 31/3/96

  1. Total number of interruptions

(a) Planned interruptions by TransPower
NIL

(b) Planned interruptions by Counties Power
305

(c) Unplanned interruptions originating within Counties Power system
221

(d) Unplanned interruptions originating with TransPower system
1

(e) Unplanned interruptions originating with E.C.N.Z.
NIL

(f) Unplanned interruptions originating with generators other than E.C.N.Z.
NIL

(g) Interruptions not included in (a) to (f)
NIL

The NIL interruption reported in categories (a), (e), (f) and (g) mean that the SAIDI, SAIFI and CAIDI data reported below are also NIL for each of these four categories of interruption.

  1. Total number of faults per 100 circuit kilometres of prescribed voltage electric line

13.28

  1. Total number of faults per 100 circuit kilometres of underground prescribed voltage line and per different nominal line voltages:
  • 11 kV underground: 8.7

Total: 8.7

  1. Total number of faults per 100 circuit kilometres of overhead prescribed voltage line and per different nominal line voltages:
  • 11 kV overhead: 13.69
  • 22 kV overhead: 18.18
  • 33 kV overhead: 9.83

Total: 13.34

  1. The SAIDI for the total of interruptions

468.58 minutes

  1. The SAIDI for the total number of interruptions within each interruption class:

(b) Planned interruptions by Counties Power: 171.46 minutes

(c) Unplanned interruptions originating within Counties Power system: 295.03 minutes

(d) Unplanned interruptions originating with TransPower system: 2.09 minutes

  1. The SAIFI for the total number of interruptions

5.60 interruptions

  1. The SAIFI for the total number of interruptions within each interruption class:

(b) Planned interruptions by Counties Power: 0.86 interruptions

(c) Unplanned interruptions originating within Counties Power system: 4.69 interruptions

(d) Unplanned interruptions originating with TransPower system: 0.05 interruptions

  1. The CAIDI for the total of all interruptions

83.72 minutes

  1. The CAIDI for the total number of interruptions within each interruption class:

(b) Planned interruptions by Counties Power: 199.16 minutes

(c) Unplanned interruptions originating within Counties Power system: 62.9 minutes

(d) Unplanned interruptions originating with TransPower system: 45.56 minutes

Number of customers has been calculated as the average of opening and closing figures for the year.



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 141


NZLII PDF NZ Gazette 1996, No 141





✨ LLM interpretation of page content

🏭 Disclosure of Reliability Performance Measures for Electricity

🏭 Trade, Customs & Industry
Electricity, Performance Measures, Financial Efficiency

🏭 Disclosure of Energy Efficiency Performance Measures and Statistics

🏭 Trade, Customs & Industry
Electricity, Energy Efficiency, System Statistics

🏭 Disclosure of Reliability Performance Measures

🏭 Trade, Customs & Industry
Electricity, Reliability Measures, Interruptions, Faults