✨ Electricity Reliability Statistics
NEW ZEALAND GAZETTE
No. 138
TAURANGA ELECTRICITY LIMITED
RELIABILITY PERFORMANCE MEASURES TO BE DISCLOSED BY LINE OWNERS
The following performance ratios are for the whole of the company’s customer base. A significant number of our customers are connected into TrustPower Limited’s network and this affects the company’s overall performance ratios.
Reliability Performance Measures pursuant to Regulation 16 and Part IV of the First Schedule to the Electricity [Information Disclosure] Regulations 1994, are:
1996
DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES
TOTAL INTERRUPTIONS ABOVE 3.3kV
| CLASS | No. OF INTERR. | DURATION FACTORS | CONNT CUST | TOTAL CUST | SAIDI | SAIFI | CAIDI |
|---|---|---|---|---|---|---|---|
| A | 0 | 0 | 0 | 4785 | 0 | 0.000 | 0 |
| B | 2 | 13200 | 55 | 4785 | 2.759 | 0.011 | 240.000 |
| C | 12 | 130634 | 2348 | 4785 | 27.301 | 0.491 | 55.636 |
| D | 1 | 64448 | 848 | 4785 | 13.469 | 0.177 | 76.000 |
| E | 0 | 0 | 0 | 4785 | 0 | 0.000 | 0 |
| F | 2 | 23880 | 296 | 4785 | 4.991 | 0.062 | 80.676 |
| G | 0 | 0 | 0 | 4785 | 0 | 0.000 | 0 |
| TOTAL | 17 | 232162 | 3547 | 4785 | 48.619 | 0.741 | 65.453 |
NUMBER OF FAULTS PER 100km AT PRESCRIBED VOLTAGE
| VOLTAGE | OVERHEAD LINES | UNDERGROUND CABLES | TOTAL |
|---|---|---|---|
| No. of Faults | Length(km) | per 100km | |
| 33kV | 0 | 8.5 | 0 |
| 11kV | 0 | 1.66 | 0 |
| TOTAL | 0 | 10.16 | 0 |
1995
DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES
TOTAL INTERRUPTIONS ABOVE 3.3kV
| CLASS | No. OF INTERR. | DURATION FACTORS | CONNT CUST | TOTAL CUST | SAIDI | SAIFI | CAIDI |
|---|---|---|---|---|---|---|---|
| A | 1 | 0 | 0 | 4401.5 | 0 | 0.000 | 0 |
| B | 13 | 9798 | 101 | 4401.5 | 2.226 | 0.023 | 97.009 |
| C | 4 | 25546 | 314 | 4401.5 | 5.804 | 0.071 | 81.367 |
| D | 0 | 0 | 0 | 4401.5 | 0 | 0.000 | 0 |
| E | 0 | 0 | 0 | 4401.5 | 0 | 0.000 | 0 |
| F | 0 | 0 | 0 | 4401.5 | 0 | 0.000 | 0 |
| G | 0 | 0 | 0 | 4401.5 | 0 | 0.000 | 0 |
| TOTAL | 18 | 35344 | 415 | 4401.5 | 8.030 | 0.094 | 85.166 |
NUMBER OF FAULTS PER 100km AT PRESCRIBED VOLTAGE
| VOLTAGE | OVERHEAD LINES | UNDERGROUND CABLES | TOTAL |
|---|---|---|---|
| No. of Faults | Length(km) | per 100km | |
| 33kV | 2 | 8.5 | 23.529 |
| 11kV | 1 | 1.66 | 60.241 |
| TOTAL | 3 | 10.16 | 29.528 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 138
NZLII —
NZ Gazette 1996, No 138
✨ LLM interpretation of page content
🏭
Tauranga Electricity Limited Reliability Performance Measures
(continued from previous page)
🏭 Trade, Customs & IndustryReliability Performance, Electricity, Tauranga Electricity Limited, Interruptions, Faults, SAIDI, SAIFI, CAIDI