✨ Reliability Performance Measures




2874 NEW ZEALAND GAZETTE No. 113

MOC Disclosure

REG 16 - PART IV

Reliability Performance Measures

April 1995 to March 1996 April 1994 to March 1995

Sect 1

31.3.1996 | 31.3.1995

Total Number of Interruptions | 344 | 313

Interruptions by Class |

Class 31.3.1996 31.3.1995
A 0 0
B 144 161
C 199 149
D 1 3
E 0 0
F 0 0
G 0 0

Sect 2

31.3.1996 | 31.3.1995

Total Faults | 200 | 149
Line Length (km) | 1721.76 | 1617.25
Faults per 100km | 11.62 | 9.21

Sect 3

Underground Cables |

Nominal Voltage 31.3.1996 Average Length (km) Faults per 100km #FAULTS 31.3.1995 Average Length (km) Faults per 100km
33kV 1 2.38 42.02 0 2.38 0.00
11kV 6 65.73 9.13 9 43.33 20.77
6.6kV 0 0 0.00 0 0 0.00
TOTAL 7 68.11 10.28 9 45.71 19.69

Sect 4

Overhead Lines |

Nominal Voltage 31.3.1996 Average Length (km) Faults per 100km #FAULTS 31.3.1995 Average Length (km) Faults per 100km
33kV 16 413.46 3.87 11 413.46 2.66
11kV 172 1210.93 14.20 121 1201.53 10.07
6.6kV 5 29.26 17.09 8 29.26 27.34
TOTAL 193 1653.65 11.67 140 1644.25 8.51


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 113


NZLII PDF NZ Gazette 1996, No 113





✨ LLM interpretation of page content

🏒 Financial and Efficiency Performance Measures for Central Electric Limited (continued from previous page)

🏒 State Enterprises & Insurance
Financial Measures, Efficiency Performance, Electricity, Central Electric Limited

🏒 Reliability Performance Measures for MOC Disclosure

🏒 State Enterprises & Insurance
Reliability, Performance Measures, Electricity, Faults, Interruptions