CENTRAL ELECTRIC LIMITED
ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS 1995/96
PURSUANT TO REGULATION 15 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
- ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES
| 31/3/96 | 31/3/95 | |
|---|---|---|
| a. Load Factor | ||
| Percentage of electrical energy entering the transmission system over maximum demand times hours per year | 45.9% | 59.1% |
| b. Loss Ratio | | |
| Transmission losses over energy entering the system | 9.4% | 10.01% |
| c. Capacity Utilisation | | |
| Maximum demand over transformer capacity | 42.3% | 33.3% |
- STATISTICS
a. b. c. System Length Analysed by Voltage (Kilometres)
| Voltage | 31/3/96 Overhead | 31/3/95 Overhead | 31/3/96 Underground | 31/3/95 Underground | 31/3/96 Total | 31/3/95 Total |
|---|---|---|---|---|---|---|
| 400V | 203.04 | 202.21 | 165.00 | 154.91 | 368.04 | 357.12 |
| 6.6kV | 29.26 | 29.26 | 0.00 | 0.00 | 29.26 | 29.26 |
| 11kV | 1,210.98 | 1,201.53 | 65.70 | 43.33 | 1,276.68 | 1,244.86 |
| 33kV | 413.46 | 413.46 | 2.38 | 2.38 | 415.84 | 415.84 |
| | 1,856.74 | 1,846.46 | 233.08 | 200.62 | 2,089.82 | 2,047.08 |
d. Transformer Capacity
| 31/3/96 | 31/3/95 | |
|---|---|---|
| 166,087 | 156,660 |
e. Maximum Demand
| 31/3/96 | 31/3/95 | |
|---|---|---|
| kW | 70,174 | 52,170 |
f. kWh
| 31/3/96 | 31/3/95 | |
|---|---|---|
| 282,295,463 | 269,768,169 |
g. To unrelated parties
| 31/3/96 | 31/3/95 | |
|---|---|---|
| Nil | Nil |
h. Customers
| 31/3/96 | 31/3/95 | |
|---|---|---|
| 18,250 | 17,280 |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 113
NZLII —
NZ Gazette 1996, No 113
β¨ LLM interpretation of page content
π’
Financial and Efficiency Performance Measures for Central Electric Limited
(continued from previous page)
π’ State Enterprises & InsuranceFinancial Measures, Efficiency Performance, Electricity, Central Electric Limited