CENTRAL ELECTRIC LIMITED

ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS 1995/96

PURSUANT TO REGULATION 15 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

  1. ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES
31/3/96 31/3/95
a. Load Factor
Percentage of electrical energy entering the transmission system over maximum demand times hours per year 45.9% 59.1%

| b. Loss Ratio | | |
| Transmission losses over energy entering the system | 9.4% | 10.01% |

| c. Capacity Utilisation | | |
| Maximum demand over transformer capacity | 42.3% | 33.3% |

  1. STATISTICS

a. b. c. System Length Analysed by Voltage (Kilometres)

Voltage 31/3/96 Overhead 31/3/95 Overhead 31/3/96 Underground 31/3/95 Underground 31/3/96 Total 31/3/95 Total
400V 203.04 202.21 165.00 154.91 368.04 357.12
6.6kV 29.26 29.26 0.00 0.00 29.26 29.26
11kV 1,210.98 1,201.53 65.70 43.33 1,276.68 1,244.86
33kV 413.46 413.46 2.38 2.38 415.84 415.84

| | 1,856.74 | 1,846.46 | 233.08 | 200.62 | 2,089.82 | 2,047.08 |

d. Transformer Capacity

31/3/96 31/3/95
166,087 156,660

e. Maximum Demand

31/3/96 31/3/95
kW 70,174 52,170

f. kWh

31/3/96 31/3/95
282,295,463 269,768,169

g. To unrelated parties

31/3/96 31/3/95
Nil Nil

h. Customers

31/3/96 31/3/95
18,250 17,280


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 113


NZLII PDF NZ Gazette 1996, No 113





✨ LLM interpretation of page content

🏒 Financial and Efficiency Performance Measures for Central Electric Limited (continued from previous page)

🏒 State Enterprises & Insurance
Financial Measures, Efficiency Performance, Electricity, Central Electric Limited