DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES

PURSUANT TO REGULATION 16 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

1995 1996
1. Total number of interruptions
(a) Planned interruptions by Trans Power 0 0
(b) Planned interruptions by Northpower 524 477
(c) Unplanned interruptions originating within Northpower system 298 277
(d) Unplanned interruptions originating within Trans Power system 5 3
(e) Unplanned interruptions originating within ECNZ system 0 1
(f) Unplanned interruptions originating within other generator’s systems 0 0
(g) Unplanned interruptions originating from other than above 0 0
  1. Total number of faults per 100 circuit kilometres of prescribed voltage electric line | 9.49 | 9.31 |

  2. Total number of faults per 100 circuit kilometres of underground prescribed voltage line and per different nominal line voltages:-

    • 11 kV underground | 4.89 | 4.15 |
    • 33 kV underground | Nil | 9.37 |
  3. Total number of faults per 100 circuit kilometres of overhead prescribed voltage lines and per different nominal line voltages:-

    • 11 kV overhead | 8.49 | 8.80 |
    • 33 kV overhead | 6.20 | 6.08 |
  4. The SAIDI for the total of interruptions | 238.0 mins | 248.6 mins |

  5. The SAIDI for the total number of interruptions within each interruption class:-
    (a) Planned interruptions by Trans Power | 0 | 0 |
    (b) Planned interruptions by Northpower | 74.29 mins | 70.77 mins |
    (c) Unplanned interruptions originating within Northpower system | 137.32 mins | 156.75 mins |
    (d) Unplanned interruptions originating within Trans Power system | 26.39 mins | 18.06 mins |

  6. The SAIFI for the total number of interruptions | 5.8 interruptions | 5.2 interruptions |

  7. The SAIFI for the total number of interruptions within each interruption class:-
    (a) Planned interruptions by Trans Power | 0 | 0 |
    (b) Planned interruptions by Northpower | 0.88 interruptions | 0.69 interruptions |
    (c) Unplanned interruptions originating within Northpower system | 3.83 interruptions | 3.61 interruptions |
    (d) Unplanned interruptions originating within Trans Power system | 0.84 interruptions | 0.68 interruptions |

  8. The CAIDI for the total of all interruptions | 41.10 mins | 48.31 mins |

  9. The CAIDI for the total number of interruptions within each interruption class:-
    (a) Planned interruptions by Trans Power | 0 | 0 |
    (b) Planned interruptions by Northpower | 84.35 mins | 102.33 mins |
    (c) Unplanned interruptions originating within Northpower system | 35.90 mins | 43.36 mins |
    (d) Unplanned interruptions originating within Trans Power system | 26.39 mins | 26.68 mins |



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 110


NZLII PDF NZ Gazette 1996, No 110





✨ LLM interpretation of page content

🏭 Disclosure of Reliability Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Reliability, Performance Measures, Interruptions, Faults, SAIDI, SAIFI, CAIDI, Northpower, Trans Power, ECNZ