DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES
PURSUANT TO REGULATION 16 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994
| 1995 | 1996 | |
|---|---|---|
| 1. Total number of interruptions | ||
| (a) Planned interruptions by Trans Power | 0 | 0 |
| (b) Planned interruptions by Northpower | 524 | 477 |
| (c) Unplanned interruptions originating within Northpower system | 298 | 277 |
| (d) Unplanned interruptions originating within Trans Power system | 5 | 3 |
| (e) Unplanned interruptions originating within ECNZ system | 0 | 1 |
| (f) Unplanned interruptions originating within other generator’s systems | 0 | 0 |
| (g) Unplanned interruptions originating from other than above | 0 | 0 |
-
Total number of faults per 100 circuit kilometres of prescribed voltage electric line | 9.49 | 9.31 |
-
Total number of faults per 100 circuit kilometres of underground prescribed voltage line and per different nominal line voltages:-
- 11 kV underground | 4.89 | 4.15 |
- 33 kV underground | Nil | 9.37 |
-
Total number of faults per 100 circuit kilometres of overhead prescribed voltage lines and per different nominal line voltages:-
- 11 kV overhead | 8.49 | 8.80 |
- 33 kV overhead | 6.20 | 6.08 |
-
The SAIDI for the total of interruptions | 238.0 mins | 248.6 mins |
-
The SAIDI for the total number of interruptions within each interruption class:-
(a) Planned interruptions by Trans Power | 0 | 0 |
(b) Planned interruptions by Northpower | 74.29 mins | 70.77 mins |
(c) Unplanned interruptions originating within Northpower system | 137.32 mins | 156.75 mins |
(d) Unplanned interruptions originating within Trans Power system | 26.39 mins | 18.06 mins | -
The SAIFI for the total number of interruptions | 5.8 interruptions | 5.2 interruptions |
-
The SAIFI for the total number of interruptions within each interruption class:-
(a) Planned interruptions by Trans Power | 0 | 0 |
(b) Planned interruptions by Northpower | 0.88 interruptions | 0.69 interruptions |
(c) Unplanned interruptions originating within Northpower system | 3.83 interruptions | 3.61 interruptions |
(d) Unplanned interruptions originating within Trans Power system | 0.84 interruptions | 0.68 interruptions | -
The CAIDI for the total of all interruptions | 41.10 mins | 48.31 mins |
-
The CAIDI for the total number of interruptions within each interruption class:-
(a) Planned interruptions by Trans Power | 0 | 0 |
(b) Planned interruptions by Northpower | 84.35 mins | 102.33 mins |
(c) Unplanned interruptions originating within Northpower system | 35.90 mins | 43.36 mins |
(d) Unplanned interruptions originating within Trans Power system | 26.39 mins | 26.68 mins |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1996, No 110
NZLII —
NZ Gazette 1996, No 110
✨ LLM interpretation of page content
🏭
Disclosure of Reliability Performance Measures
(continued from previous page)
🏭 Trade, Customs & IndustryElectricity, Reliability, Performance Measures, Interruptions, Faults, SAIDI, SAIFI, CAIDI, Northpower, Trans Power, ECNZ