DISCLOSURE OF ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS PURSUANT TO REGULATION 15 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

1. Energy Delivery Efficiency Performance Measures 1995 1996
(a) Load Factor 64.54% 66.47%
(b) Loss Ratio 5.32% 4.94%
(c) Capacity Utilisation 43.25% 41.95%
2. Statistics 1995 1996
(a) System length, broken down by voltage:
    - 33 kV 191.8 km 191.8 km
    - 11 kV 3000.8 km 3038.1 km
    - 400 V 1684.0 km 1696.4 km
    - Total 4876.6 km 4926.3 km
(b) Circuit length of overhead lines, broken down by voltage:
    - 33 kV 181.1 km 181.1 km
    - 11 kV 2956.9 km 2989.8 km
    - 400 V 1507.4 km 1511.4 km
    - Total 4645.4 km 4682.3 km
(c) Circuit length of underground cables broken down by voltage:
    - 33 kV 10.7 km 10.7 km
    - 11 kV 43.9 km 48.3 km
    - 400V 176.6 km 185.0 km
    - Total 231.2 km 244.0 km
(d) Transformer capacity 305,091 kVA 319,619 kVA
(e) Maximum demand 131,923 kW 134,095 kW
(f) Total electricity supplied from the system 706,215,792 kWh 727,689,246 kWh
(g) Total electricity conveyed through the system for other retailers Nil 8,487,862 kWh
(h) Total customers 42,557 43,146


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1996, No 110


NZLII PDF NZ Gazette 1996, No 110





✨ LLM interpretation of page content

🏭 Financial Statements Disclosure by Northpower Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Financial Statements, Fair Value, Segment Information, Contingent Liabilities, Commitments, Related Parties, Term Receivables

🏭 Energy Efficiency Performance Measures and Statistics

🏭 Trade, Customs & Industry
Energy Delivery Efficiency, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Electricity Supply, Customers