✨ Electricity Efficiency Measures




25 AUGUST NEW ZEALAND GAZETTE 2469

CENTRAL ELECTRIC LIMITED

ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

PURSUANT TO REGULATION 15 OF THE ELECTRICITY (INFORMATION DISCLOSURE) REGULATIONS 1994

  1. ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES

    a. Load Factor
    Percentage of electrical energy entering the transmission system over maximum demand times hours per year
    59.1%

    b. Loss Ratio
    Transmission losses over energy entering the system
    10.01%

    c. Capacity utilisation
    Maximum demand over transformer capacity
    33.3%

  2. STATISTICS

    a. b. c. System Length Analysed by Voltage (Kilometres)

    Voltage Overhead Underground Total
    400V 202.21 154.91 357.12
    6.6kV 29.26 0.00 29.26
    11kV 1,201.53 43.33 1,244.86
    33kV 413.46 2.38 415.84
    1,846.46 200.62 2,047.08

    d. Transformer Capacity 156,660

    e. Maximum Demand 52,170 kw

    f. Energy Delivered
    kwh 269,768,169

    g. To unrelated parties Nil

    h. Customers 17,280



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 86


NZLII PDF NZ Gazette 1995, No 86





✨ LLM interpretation of page content

🏭 Central Electric Limited Financial Certification (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Financial Performance, Efficiency Measures, Accounting Returns, Fixed Assets, Shareholders' Funds