β¨ Electricity Reliability Performance Measures
18 AUGUST NEW ZEALAND GAZETTE 2305
- The SAIDI for the Per Interruption Class
| Class | Description | Customer/Minutes |
|---|---|---|
| A | Trans Power Planned | - |
| B | ML Ltd Planned | 70 |
| C | ML Ltd Unplanned | 129 |
| D | Trans Power Unplanned | 59 |
| E | ECNZ Unplanned | - |
| F | Other Generation Unplanned | - |
| G | Other | - |
| ------- | ----------------------------- | ------------------ |
| Total | 258 |
- The SAIFI for the Total Interruptions
(SAIFFI = System Average Interruption Frequency Index)
7.12
- The SAIFI for the Per Interruption Class
| Class | Description | |
|---|---|---|
| A | Trans Power Planned | - |
| B | ML Ltd Planned | 0.37 |
| C | ML Ltd Unplanned | 1.86 |
| D | Trans Power Unplanned | 4.88 |
| E | ECNZ Unplanned | - |
| F | Other Generation Unplanned | - |
| G | Other | - |
| ------- | ----------------------------- | ---------------- |
| Total | 7.12 |
- The CAIDI for the Total Interruptions
(Customer Average Interruption Duration Index)
36.28 Customer/Minutes
- The CAIDI for the Per Interruption class
| Class | Description | Customer/Minutes |
|---|---|---|
| A | Trans Power Planned | - |
| B | ML Ltd Planned | 187.63 |
| C | ML Ltd Unplanned | 69.24 |
| D | Trans Power Unplanned | 12.10 |
| E | ECNZ Unplanned | - |
| F | Other Generation Unplanned | - |
| G | Other | - |
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 82
NZLII —
NZ Gazette 1995, No 82
β¨ LLM interpretation of page content
ποΈ
Marlborough Electric Reliability Performance Measures
(continued from previous page)
ποΈ Infrastructure & Public WorksElectricity, Reliability, SAIDI, SAIFI, CAIDI, Performance Measures