β¨ Electricity Reliability Statistics
NEW ZEALAND GAZETTE
No. 82
MARLBOROUGH ELECTRIC
Reliability Performance Measures
(Electricity (Information Disclosure) Regulations 1994 First Schedule Part IV)
- Number of Interruptions by Class
| Class | Description | Interruptions |
|---|---|---|
| A | Trans Power Planned | 0 |
| B | ME Ltd Planned | 68 |
| C | ME Ltd Unplanned | 308 |
| D | Trans Power Unplanned | 5 |
| E | ECNZ Unplanned | 0 |
| F | Other Generation Unplanned | 0 |
| G | Other | 0 |
| Total | 381 |
- The Total Number of Faults Per 100km of Line Over 3.3kV
| Faults per 100 km | 14.2 |
|---|---|
| Faults | 313 |
| Prescribed Line | 2203.244 |
- The Total Number of Faults Per 100km of Underground Cable Over 3.3kV
| Faults | kM of Cable | Faults per 100kM | |
|---|---|---|---|
| 33kV | - | 1.200 | nil |
| 11kV | 2 | 8.482 | 23.6 |
| Total | 2 | 9.682 | 20.7 |
- The Total Number of Faults Per 100km of Overhead Line Over 3.3kV
| Faults | kM of Cable | Faults per 100kM | |
|---|---|---|---|
| 33kV | 16 | 255.830 | 6.3 |
| 11kV | 295 | 1,886.573 | 15.6 |
| 6.6kV | - | 51.159 | nil |
| Total | 311 | 2,194 | 14.2 |
- The SAIDI For the Total Interruptions
(SAIDI = System Average Interruption Duration Index)
258 Customer/Minutes
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 82
NZLII —
NZ Gazette 1995, No 82
β¨ LLM interpretation of page content
ποΈ Marlborough Electric Reliability Performance Measures
ποΈ Infrastructure & Public WorksElectricity, Reliability, Interruptions, Faults, SAIDI