Electricity Performance Statistics




NEW ZEALAND GAZETTE

No. 78

TAUPO ELECTRICITY LIMITED

Performance Measures And Statistics (cont)

SAIFI (System Average Interruption Frequency Index)

(g) The SAIFI for the total interruptions

3.54

(h) The SAIFI for the total interruptions within each interruption class:

  • Class A: Planned Trans Power interruption
  • Class B: Planned interruption by any Line Operator (other than Trans Power)

0.51

  • Class C: Unplanned interruption originating within the principal Line Owner’s works.

2.03

  • Class D: Unplanned Trans Power interruption

0.99

  • Class E: Unplanned ECNZ interruption
  • Class F: Unplanned interruption originating from a generator other than ECNZ
  • Class G: Other

CAIDI (Electricity Customer Average Interruption Data Index)

(i) The CAIDI for the total interruptions

108.00

(j) The CAIDI for the total interruptions within each interruption class:

  • Class A: Planned Trans Power interruption
  • Class B: Planned interruption by any Line Operator (other than Trans Power)

97.00

  • Class C: Unplanned interruption originating within the principal Line Owner’s works.

31.00

  • Class D: Unplanned Trans Power interruption

272.00

  • Class E: Unplanned ECNZ interruption
  • Class F: Unplanned interruption originating from a generator other than ECNZ
  • Class G: Other


Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 78


NZLII PDF NZ Gazette 1995, No 78





✨ LLM interpretation of page content

🏭 Performance Measures and Statistics for Taupo Electricity Limited (continued from previous page)

🏭 Trade, Customs & Industry
Financial Performance, Efficiency Measures, Energy Delivery, Statistics, Electricity