NEW ZEALAND GAZETTE
No. 78
TAUPO ELECTRICITY LIMITED
Performance Measures And Statistics (cont)
SAIFI (System Average Interruption Frequency Index)
(g) The SAIFI for the total interruptions
3.54
(h) The SAIFI for the total interruptions within each interruption class:
- Class A: Planned Trans Power interruption
- Class B: Planned interruption by any Line Operator (other than Trans Power)
0.51
- Class C: Unplanned interruption originating within the principal Line Owner’s works.
2.03
- Class D: Unplanned Trans Power interruption
0.99
- Class E: Unplanned ECNZ interruption
- Class F: Unplanned interruption originating from a generator other than ECNZ
- Class G: Other
CAIDI (Electricity Customer Average Interruption Data Index)
(i) The CAIDI for the total interruptions
108.00
(j) The CAIDI for the total interruptions within each interruption class:
- Class A: Planned Trans Power interruption
- Class B: Planned interruption by any Line Operator (other than Trans Power)
97.00
- Class C: Unplanned interruption originating within the principal Line Owner’s works.
31.00
- Class D: Unplanned Trans Power interruption
272.00
- Class E: Unplanned ECNZ interruption
- Class F: Unplanned interruption originating from a generator other than ECNZ
- Class G: Other
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 78
NZLII —
NZ Gazette 1995, No 78
✨ LLM interpretation of page content
🏭
Performance Measures and Statistics for Taupo Electricity Limited
(continued from previous page)
🏭 Trade, Customs & IndustryFinancial Performance, Efficiency Measures, Energy Delivery, Statistics, Electricity