β¨ Energy Delivery Performance Measures
27 NOVEMBER NEW ZEALAND GAZETTE 4563
8 Planned interruption restoration performance 92.5% 76.6%
9 Unplanned interruption response 100% 99.6%
The information compiled using estimated information includes Part V sections 2, 3, 4, 5, 6 and 7.
The methodology used to calculate the estimated information is documented and available from Trans Power upon request.
- These figures have been changed from those published in the 1993/94 Transmission Quality Report.
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 139
NZLII —
NZ Gazette 1995, No 139
β¨ LLM interpretation of page content
ποΈ
Energy Delivery Efficiency Performance Measures and Statistics
(continued from previous page)
ποΈ Infrastructure & Public WorksEnergy Delivery, Efficiency Measures, Transmission Losses, Capacity Utilisation, System Length, Circuit Length, Voltage Breakdown, Reliability Performance, Unplanned Interruptions, Electricity Customer Interruptions, Supply Reliability, Uneconomic Generation, HVDC System, Planned Interruption Restoration, Unplanned Interruption Response