4562 NEW ZEALAND GAZETTE No. 139
Regulation 17 and Part V of the First Schedule
Reliability Performance Measures
| 12 Months 30 June 1995 |
12 Months 30 June 1994 |
||
|---|---|---|---|
| 1 | Total number of unplanned interruptions Resulting from 118 loss of supply incidents in 1994/95 |
182 | 224 |
| 2 | Electricity customer interruptions Comprising 4.4 system minutes due to planned outages and 15.1 system minutes due to unplanned outages in 1994/95 |
19.5 system minutes | 15.1 system minutes |
| 3 | Underlying electricity customer interruptions Underlying interruptions are those interruptions less than 1 system minute duration. The total comprises 2.9 system minutes for planned outages and 11.2 system minutes for unplanned interruptions. |
14.1 system minutes | 10.3 system minutes |
| 4 | Average supply reliability Measured by the energy supplied divided by the sum of the energy supplied and not supplied. |
99.9942% | 99.9956% |
| 5 | Uneconomic generation due to planned and unplanned transmission system unavailability Uneconomic generation relates to the amount of electricity generated from any source other than the most economic source. |
0.68% | 0.81% |
| 6 | Uneconomic generation due to HVDC system unavailability | 0.60% | 0.69% |
| 7 | Uneconomic generation due to unplanned transmission system unavailability | 0.51% | 0.07% |
35
Next Page →
PDF embedding disabled (Crown copyright)
View this page online at:
VUW Te Waharoa —
NZ Gazette 1995, No 139
NZLII —
NZ Gazette 1995, No 139
β¨ LLM interpretation of page content
ποΈ
Energy Delivery Efficiency Performance Measures and Statistics
(continued from previous page)
ποΈ Infrastructure & Public WorksEnergy Delivery, Efficiency Measures, Transmission Losses, Capacity Utilisation, System Length, Circuit Length, Voltage Breakdown, Reliability Performance, Unplanned Interruptions, Electricity Customer Interruptions, Supply Reliability, Uneconomic Generation, HVDC System