✨ Reliability Performance Measures




4562 NEW ZEALAND GAZETTE No. 139

Regulation 17 and Part V of the First Schedule

Reliability Performance Measures

12 Months
30 June 1995
12 Months
30 June 1994
1 Total number of unplanned interruptions
Resulting from 118 loss of supply incidents in 1994/95
182 224
2 Electricity customer interruptions
Comprising 4.4 system minutes due to planned outages and 15.1 system minutes due to unplanned outages in 1994/95
19.5 system minutes 15.1 system minutes
3 Underlying electricity customer interruptions
Underlying interruptions are those interruptions less than 1 system minute duration. The total comprises 2.9 system minutes for planned outages and 11.2 system minutes for unplanned interruptions.
14.1 system minutes 10.3 system minutes
4 Average supply reliability
Measured by the energy supplied divided by the sum of the energy supplied and not supplied.
99.9942% 99.9956%
5 Uneconomic generation due to planned and unplanned transmission system unavailability
Uneconomic generation relates to the amount of electricity generated from any source other than the most economic source.
0.68% 0.81%
6 Uneconomic generation due to HVDC system unavailability 0.60% 0.69%
7 Uneconomic generation due to unplanned transmission system unavailability 0.51% 0.07%

35



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1995, No 139


NZLII PDF NZ Gazette 1995, No 139





✨ LLM interpretation of page content

πŸ—οΈ Energy Delivery Efficiency Performance Measures and Statistics (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
Energy Delivery, Efficiency Measures, Transmission Losses, Capacity Utilisation, System Length, Circuit Length, Voltage Breakdown, Reliability Performance, Unplanned Interruptions, Electricity Customer Interruptions, Supply Reliability, Uneconomic Generation, HVDC System