✨ Railway Rates




  1. Rates:
Miles Not Exceeding Rate per Ton Miles Not Exceeding Rate per Ton Miles Not Exceeding Rate per Ton
12 ... $2.38 100 ... $5.43 350 ... $11.38
14 ... $2.38 105 ... $5.55 360 ... $11.61
16 ... $2.38 110 ... $5.67 370 ... $11.84
18 ... $2.38 115 ... $5.79 380 ... $12.08
20 ... $2.38 120 ... $5.92 390 ... $12.31
22 ... $2.59 125 ... $6.04 400 ... $12.55
24 ... $2.73 130 ... $6.16 410 ... $12.77
26 ... $2.86 135 ... $6.28 420 ... $13.00
28 ... $2.93 140 ... $6.41 435 ... $13.34
30 ... $3.00 145 ... $6.53 450 ... $13.69
32 ... $3.08 150 ... $6.65 465 ... $14.04
34 ... $3.16 155 ... $6.77 480 ... $14.39
36 ... $3.24 160 ... $6.90 495 ... $14.73
38 ... $3.32 165 ... $7.02 510 ... $15.08
40 ... $3.41 170 ... $7.14 525 ... $15.43
42 ... $3.49 175 ... $7.26 540 ... $15.78
44 ... $3.57 180 ... $7.39 555 ... $16.12
46 ... $3.65 185 ... $7.51 570 ... $16.47
48 ... $3.73 190 ... $7.63 585 ... $16.82
50 ... $3.82 195 ... $7.75 600 ... $17.17
52 ... $3.90 200 ... $7.88 615 ... $17.52
54 ... $3.98 210 ... $8.11 630 ... $17.86
56 ... $4.06 220 ... $8.34 645 ... $18.21
58 ... $4.14 230 ... $8.58 660 ... $18.56
60 ... $4.23 240 ... $8.81 675 ... $18.91
62 ... $4.31 250 ... $9.04 690 ... $19.25
64 ... $4.39 260 ... $9.28
66 ... $4.47 270 ... $9.51
68 ... $4.55 280 ... $9.74
70 ... $4.64 290 ... $9.98
75 ... $4.77 300 ... $10.21
80 ... $4.91 310 ... $10.44
85 ... $5.04 320 ... $10.68
90 ... $5.17 330 ... $10.91
95 ... $5.30 340 ... $11.14

For each additional 15 miles or fraction thereof beyond 690 miles add 35 cents.

  1. Handling and Tallying:

The department may require all loading, unloading, or tallying to be performed by the owners. Where loading, unloading, or tallying is performed by the department, charges as per section 122 will apply.

  1. The charges in paragraph 3 of this section, with loading and/or unloading charges added, shall not be greater than when computed at Class D rate.

  2. Hay, Straw and Chaff

  3. Hay and straw (baled) and chaff will be charged at the wagon rates specified in paragraph 2 hereof, or on actual weight at class E plus 50% whichever is cheaper.

  4. (a) Rates per wagon (owners to load and unload) will be charged as follows:

(i) Per four wheeled wagon not otherwise specified ... at the rates specified in sub-paragraph (b) hereof.

(ii) Per Kc, Kr, Ks, Lc, Xc or Xr wagon ... at the rates specified in sub-paragraph (b) hereof increased by 25%.

(b) Rates

Miles Hay Straw Chaff Miles Hay Straw Chaff
$ $ $ 150 $45.65 $37.26 $53.73
18 $14.44 $12.74 $16.84 155 $46.55 $38.09 $54.79
20 $14.78 $12.74 $17.25 160 $47.37 $39.06 $55.77
22 $15.80 $12.74 $18.47 165 $48.18 $39.91 $56.74
24 $16.83 $12.74 $19.70 170 $49.14 $41.00 $57.89
26 $17.71 $13.14 $20.75 175 $49.96 $41.46 $58.86
28 $18.33 $14.16 $21.48 180 $50.78 $42.43 $59.84
30 $18.74 $14.63 $21.98 185 $51.66 $43.41 $60.89
32 $19.15 $15.00 $22.46 190 $52.48 $44.37 $61.87
34 $19.56 $15.52 $22.95 195 $53.37 $45.20 $62.93
36 $19.97 $15.92 $23.44 200 $54.19 $45.60 $63.90
38 $20.38 $16.37 $23.93 210 $55.97 $47.54 $66.02
40 $20.79 $16.37 $24.41 220 $57.60 $49.09 $67.98
42 $21.40 $16.82 $25.15 230 $59.30 $50.90 $70.00
44 $22.22 $17.27 $26.12 240 $61.02 $52.85 $72.04
46 $23.04 $17.27 $27.10 250 $62.72 $54.26 $74.08
48 $23.86 $17.66 $28.08 260 $66.35 $58.01 $78.04
50 $24.68 $18.18 $29.05 270 $68.05 $59.38 $80.06
52 $25.49 $18.56 $30.03 280 $69.83 $61.32 $82.18
54 $25.90 $18.56 $30.51 290 $71.46 $63.14 $84.14
56 $26.18 $18.95 $30.84 300 $73.17 $64.55 $86.17
58 $26.80 $19.40 $31.57 310 $74.88 $66.50 $88.20
60 $27.41 $19.40 $32.31 320 $76.65 $68.30 $90.32
62 $28.02 $19.93 $33.04 330 $78.36 $69.78 $92.36
64 $28.63 $20.31 $33.77 340 $80.06 $71.35 $94.29
66 $29.18 $20.70 $34.42 350 $81.70 $73.15 $96.34
68 $29.80 $20.70 $35.15 360 $83.48 $75.10 $98.46
70 $30.41 $21.22 $35.89 370 $85.19 $76.90 $100.50
75 $31.03 $22.71 $36.62 380 $86.96 $78.84 $102.61
80 $31.64 $24.18 $37.35 390 $88.80 $80.65 $104.80
85 $32.18 $24.64 $38.00 400 $90.57 $82.72 $106.92
90 $33.14 $25.03 $39.14 410 $92.42 $84.86 $109.12
95 $34.03 $26.00 $40.20 420 $94.20 $86.93 $111.24
100 $34.91 $27.10 $41.25 435 $96.52 $89.01 $114.00
105 $37.54 $29.63 $44.05 450 $98.76 $91.20 $116.69
110 $38.36 $30.60 $45.02 465 $101.43 $93.46 $119.86
115 $39.24 $31.69 $46.08 $2.41 $2.87 $2.18
120 $40.19 $32.01 $47.22
125 $41.09 $33.12 $48.28
130 $41.97 $34.08 $49.34
135 $43.13 $34.92 $50.73
140 $43.95 $35.90 $51.70
145 $44.84 $36.74 $52.75

For each additional 15 miles or fraction thereof beyond 465 miles will be addedβ€”

REPRINT No. 1, 8/11/71

SERIAL No. 31

SERIAL No. 32



Next Page →

PDF embedding disabled (Crown copyright)

View this page online at:


VUW Te Waharoa PDF NZ Gazette 1971, No 83


NZLII PDF NZ Gazette 1971, No 83





✨ LLM interpretation of page content

πŸ—οΈ Railway Rates for Artificial Fertilisers and Manure (continued from previous page)

πŸ—οΈ Infrastructure & Public Works
8 November 1971
Railway rates, Artificial fertilisers, Manure, Wagon loads, Bulk, Bagged

πŸ—οΈ Handling and Tallying Charges

πŸ—οΈ Infrastructure & Public Works
Handling charges, Tallying charges, Loading, Unloading

πŸ—οΈ Hay, Straw, and Chaff Rates

πŸ—οΈ Infrastructure & Public Works
Hay rates, Straw rates, Chaff rates, Wagon loads, Owners to load and unload