✨ Proclamation for Transmission Line Easement
NEW ZEALAND GAZETTE, No. 79 — 8 SEPTEMBER 2016
Gore District
Lt Gen The Rt Hon Sir JERRY MATEPARAE,
Governor-General
A Proclamation
Pursuant to section 186(2) of the Resource Management Act 1991 and section 26 of the Public Works Act 1981, I, Lieutenant General The Right Honourable Sir Jerry Mateparae, Governor-General of New Zealand, hereby declare the easement in gross over the land described in the First Schedule to be taken for the GOR-TEE A Transmission Line Project and vested in Transpower New Zealand Limited on the 14th day after the date of the publication of this Proclamation in the New Zealand Gazette.
The terms of the easement are set out in the Second Schedule.
Southland Land District—Gore District
First Schedule
Part Lot 42 DP 82 (Computer Freehold Register SL6B/1229); marked “A” on SO 476171.
Second Schedule
Rights, Powers, Terms, Covenants, Conditions and Restrictions Included in the Easement (“Easement”)
- Use of Defined Terms
1.1 Capitalised terms used throughout this Easement are defined in clause 12.
1.2 In this Easement, references to “Landowner” are references to the registered owner for the time being of the Land (or any part of the Land) and include:
a. the registered owner at the date of this Easement and that person’s successors in title; and
b. where appropriate, the employees, contractors, agents, tenants and invitees of the registered owner of the Land (or any part of the Land).
1.3 In this Easement, references to “Transpower” are references to the holder for the time being of the Easement and include:
a. Transpower New Zealand Limited and its transferees and successors;
b. any subsidiary or related companies of the holder of the Easement; and
c. where appropriate, the employees, contractors, agents and invitees of the holder of the Easement.
- Transpower’s Rights
2.1 This Easement gives Transpower the following rights:
a. To construct, install, inspect, operate, repair, maintain, renew, replace, upgrade, add to, modify and remove the Line or any part of the Line on the Easement Area;
b. to convey, conduct, send, distribute, pass, convert, transport, transmit and receive electricity by means of the Line;
c. to undertake any tests, investigations, surveys and ancillary works (including the temporary or permanent relocation (including by replacement) of any cables, lines and pipes) to exercise Transpower’s rights and obligations under this Easement;
d. to enter, from any reasonable location, and remain on the Easement Area and the Accessway with or without Vehicles and Equipment for so long as is reasonably necessary to exercise Transpower’s rights and obligations under this Easement;
e. to enter, from any reasonable location, and remain on parts of the Land outside the Easement Area and the Accessway with or without Vehicles and Equipment to exercise Transpower’s rights and obligations under this Easement, but only if:
i. the Accessway is not available for any reason;
ii. access to and from the Easement Area is by air; or
iii. Transpower reasonably needs to have access outside the Easement Area and the Accessway to exercise any of Transpower’s rights under this Easement;
55
Next Page →
✨ LLM interpretation of page content
🏗️ Proclamation for GOR-TEE A Transmission Line Project Easement
🏗️ Infrastructure & Public WorksEasement, Transmission Line, GOR-TEE A, Transpower, Resource Management Act 1991, Public Works Act 1981
- Jerry Mateparae (Lieutenant General The Right Honourable Sir), Issued proclamation for easement
- Lt Gen The Rt Hon Sir JERRY MATEPARAE, Governor-General
NZ Gazette 2016, No 79