Land Acquisitions and Easements




NEW ZEALAND GAZETTE, No. 67 — 28 JULY 2016

Area ha Description
0.0002 Part Lot 5 DPS 82613; shown as Section 17 on SO 489379 (balance Computer Freehold Register SA65B/754).
0.0027 Part Lot 1 DPS 14276; shown as Section 8 on SO 489379 (part Computer Freehold Register SA34A/939).

Second Schedule

Area ha Description
0.0003 Part Lot 4 DPS 82613; shown as Section 12 on SO 311279 (balance Computer Freehold Register SA65B/753).

Dated at Wellington this 25th day of July 2016.

N. RANDRUP, for the Minister for Land Information.

(LINZ CPC/2006/11662, CPC/1998/731)

2016-ln4336


Stormwater Easement Acquired—148 Ireland Road, Panmure, Auckland

Pursuant to sections 20 and 28 of the Public Works Act 1981, and to a delegation from the Minister for Land Information, Natalie Randrup, Land Information New Zealand, declares that, an agreement to that effect having been entered into, a stormwater easement in gross in favour of the Auckland Council is hereby acquired over the land described in the Schedule to this notice, upon the terms and conditions set out in Schedule 4 of the Land Transfer Regulations 2002, except that Schedule 4 of the Land Transfer Regulations 2002 is modified by this notice and the following shall apply:

Definitions

Stipulated Course means the area marked "A" on SO 500654.

Easement Facility means any pipes, manholes, pumps, pump sheds, storage tanks, water purifying equipment, Stormwater sand filtering and drainage system, treatment device, erosion control measures including ground rip-rap and a stilling basin, other equipment suitable for conveying Stormwater (under, above and through the stipulated course) and anything in replacement or substitution.

Stormwater includes rain, storm, spring, soakage or seepage water, as well as water accumulated within the Van Damm’s Lagoon Reserve or on other land and from any public street.

Rights and Powers

1.1 The grantor grants to the grantee as an easement in gross forever the right to convey and drain Stormwater without obstruction and in any quantity through the Easement Facility now laid or to be laid through the stipulated course and to discharge the Stormwater beyond the servient land.

1.2 The grantee also has the right, subject to clause 2, to enter the stipulated course and any other parts of the servient land as are reasonable to do the following work:

1.2.1 to dig and lay the Easement Facility through or on the stipulated course, at a depth of and line determined by the grantee;

1.2.2 to inspect, maintain, repair, dig up, alter, enlarge, renew or replace:

(a) the Easement Facility (including replacement with an Easement Facility of the same or larger diameter); and

(b) the Easement Facility within the grantee’s land adjoining the servient land; and

1.2.3 to do anything else in full exercise of the rights in this easement with the grantee’s agents, contractors and employees, and with or without tools, plant, equipment and vehicles.

1.3 The grantee may leave any vehicles or equipment on the servient land for a reasonable period of time if work is proceeding.

1.4 The grantee will ensure that any work it performs is carried out in a proper and workmanlike manner.

65



Next Page →



Online Sources for this page:

Gazette.govt.nz PDF NZ Gazette 2016, No 67





✨ LLM interpretation of page content

🗺️ Land Acquired for Road and the Functioning Indirectly of a Road (Segregation Strip)—State Highway 2, Tauranga Eastern Link and Parton Road, Tauranga City (continued from previous page)

🗺️ Lands, Settlement & Survey
25 July 2016
Road Declaration, Segregation Strip, Public Works Act 1981, State Highway 2, Tauranga City
  • N. Randrup, for the Minister for Land Information

🗺️ Stormwater Easement Acquired—148 Ireland Road, Panmure, Auckland

🗺️ Lands, Settlement & Survey
Stormwater Easement, Public Works Act 1981, Auckland Council, Land Transfer Regulations 2002
  • Natalie Randrup, Land Information New Zealand