Area
ha | Description
--- | ---
1.8110 | Part Lot 3 DP 72985 (Computer Freehold Register WN40D/130); shown as Section 2 on SO 470914.
Functioning indirectly of a Road
Area
ha | Description
--- | ---
1.4166 | Part Lot 3 DP 72985 (Computer Freehold Register WN40D/130); shown as Section 3 on SO 470914.
Second Schedule
Easement in favour of the Crown for the functioning indirectly of a road (stormwater easement) shown as "A" on SO 470914.
Third Schedule
Land Required for Leasehold Estate
Area
ha | Description
--- | ---
1.6965 | Part Lot 3 DP 72985 (Computer Freehold Register WN40D/130); shown as Area 101A on SO 470914.
0.9360 | Part Lot 3 DP 72985 (Computer Freehold Register WN40D/130); shown as Area 102A on SO 470914.
Fourth Schedule
Interpretation
-
The provisions of clauses 1, 2 and 10–14 of the Fourth Schedule of the Land Transfer Regulations 2002 are implied into this Easement Instrument except to the extent expressly provided for the contrary in this Easement Instrument.
-
In this Easement Instrument:
a. "Easement Facility" means the Stormwater manholes and Stormwater culvert.
b. "Servient Land" means Section 4 on SO 470914 (Computer Freehold Register WN40D/130).
c. "Stipulated Area" means that part of the Servient Land shown as "A" on SO 470914.
d. "Stormwater corridor" means the land under which the Easement Facility is to be constructed by the Grantee.
e. "Stormwater culvert" means the underground pipeline to be constructed by the Grantee within the Stipulated Area.
f. "Stormwater manholes" means the circular underground concrete structures to be constructed by the Grantee within the Stipulated Area. Each such manhole will be fitted with a solid cover and collects stormwater runoff and routes it through underground pipes. It is an access point for underground pipes maintenance. -
The NZ Transport Agency may exercise any of the rights and powers of the Grantee under this Easement Instrument.
Purpose
-
The purpose of the Easement Facility is to drain the stormwater runoff from the road (Wellington Northern Corridor – MacKays to Peka Peka Expressway), following works carried out by the Grantee, in the immediate vicinity of the Servient Land.
-
The Grantee needs to ensure the unimpeded performance of the Easement Facility in perpetuity, and
67
Next Page →
✨ LLM interpretation of page content
🗺️
Land Taken for Road and for the Functioning Indirectly of a Road—Wellington Northern Corridor (MacKays to Peka Peka Expressway), 109 Kapiti Road, Paraparaumu, Kapiti Coast District
(continued from previous page)
🗺️ Lands, Settlement & SurveyLand acquisition, Road, Wellington Northern Corridor, Kapiti Coast District, Easement
NZ Gazette 2015, No 92